InvestorsHub Logo
Post# of 1082
Next 10
Followers 52
Posts 39929
Boards Moderated 9
Alias Born 04/02/2005

Re: Lone Clone post# 792

Thursday, 02/15/2007 10:53:23 AM

Thursday, February 15, 2007 10:53:23 AM

Post# of 1082
EMED Mining receives positive feasibility study on Klirou copper-zinc project

Source: Edited Press Release

http://metalsplace.com/metalsnews/?a=10205

EMED Mining said Thursday that it has expanded resources at its Klirou copper-zinc project in Cyprus.

The Preliminary Feasibility Study on the Klirou Copper-Zinc Project has been completed with satisfactory results and concluded:

* Inferred Resources expanded to 6.6 million tonnes of 0.7% copper-equivalent, excluding associated gold (refer technical background below for JORC-compliant resources statement) for contained metal of 18,500 tonnes copper and 53,600 tonnes zinc with market value of GBP140 million (US$270 million) at current spot market values and excluding by-product gold credits.

* Drilling results indicate potential in five locations to increase resource-base within easy-trucking distance of the plant.

* Geophysical results reveal deeper targets with potential for +10 million tonne deposits which are planned to be drill-tested during 2007. * Initial environmental baseline surveys indicate the site continues to be an excellent site for its long-standing purpose and the environmental legacy to be capable of proper remediation.

* Permitting roadmap agreed with regulators.

* Preliminary financial model indicates an encouraging range of net present values, based on:
• Copper price of $US2.00/lb and zinc price of $US1.00/lb (LME spot prices on Feb. 8, 2007 were $US2.37/lb and $US1.38/lb, respectively);
• Initial open-pit model recovering 4.6 million tonnes from total resource of 6.6 million tonnes;
• Initial metallurgical test work indicating good copper recoveries and the need to improve zinc and gold recoveries;
• Operating costs based on preliminary quotations received from relevant suppliers, and
• Refurbishment of the Mitsero processing plant and continued use of existing site for waste.

AMC Consultants, an international project manager, have been appointed to oversee:

* a Feasibility Study to be completed in 2007, which will include a detailed Environmental Impact Assessment by appropriate specialists and detailed cost-engineering for the entire operation including mining, transport, ore processing and shipment.

* a Final Feasibility Study following receipt of regulatory permits for the development of the Klirou Copper-Zinc Project targeting development in 2008. This further work will include sufficient drilling to upgrade resources into the reserve category along with final optimised engineering, costings, product pricing and financing.
Join InvestorsHub

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.