InvestorsHub Logo
Followers 134
Posts 24335
Boards Moderated 6
Alias Born 03/03/2013

Re: patrik post# 251943

Wednesday, 12/14/2022 7:23:12 AM

Wednesday, December 14, 2022 7:23:12 AM

Post# of 278025
As I stated previously; it's the technology:

While it was our largest single-month production batch to date, it did not meet the target we had for their first production batch. The shortage in production output for the first shipment is tied to the acclimation and conditioning of our silkworm line to the local production environment.

Kraig’s US and Vietnam teams are working closely together with the third-party producer to address the hurdles they are facing in an effort to rapidly grow production capacity. In addition to the ongoing efforts to boost production through the acclimation of our silkworm lines to the local climate, we are also accelerating the introduction of a multiple-strain hybrid silkworm model used in conventional silk production to increase robustness. We remain confident that implementing these processes and technologies is the best path to successfully grow our production output to match the targeted metric ton per month levels we have contracted with them to produce by late 2023



Infrastructure not the problem, after all this time.

2024, if that.

Still time to get them at these embarrassingly low prices. frown


Thought there were no problems with production. Wasnt that the
Prevailing theme here. Yorkville still selling as to the pps? Wrong on
Both counts. Time for more excuses? We as a group really need to stick
To the facts not wishful thinking and stating things as facts when unless
You are an insider none of us have any real idea what is happening with
The company
Patrik





TRUISM
Bearish
Bearish

I've never claimed to have all the answers but feel i'm beginning to corner the market in questions worthy of them.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KBLB News