InvestorsHub Logo
Followers 5
Posts 2568
Boards Moderated 0
Alias Born 11/03/2019

Re: SidewaysTrader post# 124

Friday, 10/28/2022 7:19:26 AM

Friday, October 28, 2022 7:19:26 AM

Post# of 294
The high flow rate was encountered in both holes drilled in 2018. This high flow rate is expected to result in reduced operational costs in a reduction of pumps required, as well as ensuring the columns have sufficient brine with the Ekosolve™? extraction methodology contemplated for the Pocitos 1 project.