InvestorsHub Logo
Followers 57
Posts 20059
Boards Moderated 3
Alias Born 09/23/2009

Re: None

Wednesday, 08/31/2022 2:48:20 PM

Wednesday, August 31, 2022 2:48:20 PM

Post# of 7332
$MUX McEwen Mining Inc.

McEwen Mining Inc. 16,929 followers 29m •

29 minutes ago

The construction of the access road to the Gold Bar South Mine has begun. This work will be completed in approximately six weeks. Gold Bar South will benefit from a lower waste stripping ratio than our present operations. While the recovery will be slightly lower, the average gold grade will be higher, and we should see more recovered gold. This will contribute to lower cost production in Q4 2022 and throughout 2023.

A new highly productive and versatile D10 Dozer that will be used in the road construction has been delivered. It started building the road this week. In the picture, taken last week, our Chief Operating Officer Bill Shaver is standing by the machine to give context to the size of the D10.


Linkedin page
https://www.linkedin.com/feed/update/urn:li:activity:6970805481749565440/
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent MUX News