InvestorsHub Logo
Followers 43
Posts 5751
Boards Moderated 0
Alias Born 04/12/2021

Re: None

Tuesday, 07/26/2022 7:59:31 PM

Tuesday, July 26, 2022 7:59:31 PM

Post# of 96
Endlessly Scouting for lithium that is not being mined from the ground for sale:

“5:00a ET 7/25/2022 - Globe Newswire
Jourdan Starts Soil Sampling Program at Preissac-La Corne and Baillarge Projects
EQNX::TICKER_START (TSX-V:JOR),(OTC US:JORFF),(Other OTC:JORFF),(Boerse Stuttgart - Freiverkehr:2JR1), EQNX::TICKER_END JOURDAN RESOURCES INC. (TSXV: JOR; OTCQB: JORF, FRA:2JR1) ("Jourdan" or the "Company") is pleased to announce that it has commenced a soil sampling program on the majority of its claims located in the long-established lithium mining district of Preissac-La Corne, which is approximately 35km north of Val-d'Or in Quebec, Canada.

The sampling program is being conducted on a 400m x 200m regional grid and represents a pre-cursor to a potential future drilling program. A field crew consisting of geological and exploration technicians has been mobilized to the area and has begun collecting soil samples. Soil samples are being collected using two-person teams equipped with picks and shovels. Samples are being collected from the b-horizon at a depth ranging from 10 cm to 90 cm. Approximately 1,000 sites are scheduled to be sampled. To date, the soil sampling technique, utilizing both in-situ and pXRF analysis directly in the field, is working very efficiently to test these large areas rigorously, rapidly and cost-effectively. Samples are being analyzed on a daily and weekly basis for rubidium (Rb) and tantalum (Ta) by the latest model X-505 portable XRF gun from SciAps. Samples are then sent to Impact Global Solutions (IGS) lab in Delson, Quebec for pathfinder element analysis.

The soil sampling program is aimed at finding new lithium anomalies and showings in areas of known lithium mineralization at Baillarge, Preissac-La Corne, Duval Lithium in La Motte, as well as Vallee Lithium. We also expect to commence a geological mapping and prospecting program in the near future to run parallel with the soil sampling program.

Sample data collected includes UTM location, depth of sample, color, moisture content, texture (sand, silt, clay), and percentage, angularity and lithology of pebbles and or cobbles. Samples collected amount to approximately 1 kilogram of material and are placed in plastic sample bags. Wet samples are additionally placed into 5 ml plastic Ziploc bags to prevent contamination. At the end of the day, all samples are placed inside the Company's shop facility on a rack and allowed to dry for at least one week before shipping to Impact Global Solutions (IGS) lab in Delson, Quebec.

The geochemical soil sampling program was designed and is being sampled by GeoTasks Inc. technicial team from Sudbury, Ontario. Their technical team is supervised by OGQ compliant senior geologists.

"We are not only committed to the establishing an initial mineral resource at Vallee, our flagship property, but we are focussed on the further exploration at our Baillarge and Preissac-LaCorne properties," said Dr. Andreas Rompel, Jourdan's executive Chairman.

Jourdan's Chief Executive Officer, Rene Bharti, stated, "Jourdan is pleased to begin exploration on its other significant properties. The Company is keenly focused on establishing an initial mineral resource estimate at Vallee in the near term and commencing a drill program in the near future at its other two properties, Baillarge and Preissac-La Corne. With such a relatively large land package, Jourdan is fortunate to have other extremely interesting properties to explore and develop. We anticipate announcing our initial resource estimate on our Vallee property in the near term, but will continue to move towards an aggressive exploratory drill campaign on our Preissac-La Corne and Baillarge properties."

Figure 1: Soil sampling location on the Jourdan properties which are approximately 35km north of Val-d'Or.

https://www.globenewswire.com/NewsRoom/AttachmentNg/553c3a80-9b09-4511-bffd-8941be15d523

The Company's now completed diamond drilling program of 3,629m was intended to follow up on the results of a 40-tonne bulk sample collected in 2018, the fence line drilled in 2011, and follow-up drilling in 2021 along the western side of the Company's Vallee property, which borders the North American Lithium mine. As anticipated, the drilling program substantially extended the known deposit at the Company's Vallee property eastwards. Since February 2022, 18 holes of approximately 200m depth have been drilled, each aimed at the pegmatite swarm identified by the trenching of the bulk sample collected on the Vallee property in 2018. The assay results from the bulk sample revealed high Li2O grades (for more information, please see the Company's press release dated April 29, 2021, which is available under the Company's SEDAR profile at www.sedar.com), which have encouraged the Company to continue exploration and exploratory drilling along the strike and depth extents of its Vallee property.

Jourdan has significantly enlarged its database by adding more drillholes since the start of the exploration work in 2011. The 2011 drilling comprised 21 drillholes (4,256m), the 2021 campaign consisted of eight drillholes (1,680m) and with the completed 3,629m in 2022, Jourdan has more than 9,490m (47 holes) of core that the Company intends to use in the future to establish an initial mineral resource estimate.

my posts are always theory and not financial advice