InvestorsHub Logo
Followers 30
Posts 2752
Boards Moderated 0
Alias Born 02/11/2018

Re: None

Monday, 12/06/2021 7:11:10 AM

Monday, December 06, 2021 7:11:10 AM

Post# of 23
Baselode Reports High-Grade Uranium Within 15.5 Metre Mineralized Zone at ACKIO Discovery
https://baselode.com/news/baselode-reports-high-grade-uranium-within-15.5-metre-mineralized-zone-at-ackio-discovery/

December 6, 2021
Toronto, Ontario – December 06, 2021 – Baselode Energy Corp. (TSXV: FIND, OTCQB: BSENF) ("Baselode" or the "Company") is pleased to report Uranium assay results from the first diamond drill hole, AK21-01, of the recent ACKIO Uranium discovery (“ACKIO”) on the Hook project (“Hook”), Athabasca Basin area, northern Saskatchewan.

Highlights include:

High-grade* Uranium confirmed; 1.29 wt% U3O8 over 0.5 m at 138.8 m and 0.66 wt% U3O8 over 0.5 m at 142.3 m
Primary mineralized zone measuring 15.5 m of 0.13 wt% U3O8 starting at 134.3 m
Multiple uranium intersections occurring over 200 m of drill hole length.
“We are very excited with the confirmation of high-grade Uranium at ACKIO. The ACKIO discovery is beginning to take shape; with high-grade Uranium intersected near-surface, multiple and widespread zones of mineralization, and an alteration halo that exceeds over 230 m which is suggestive of a massive structurally-controlled fluid system. We are still in the early days of exploring and learning more about ACKIO but these assay results from AK21-01 have provided us with invaluable information to help us plan our next steps accordingly,” said James Sykes, CEO, President and Director of Baselode.

The Company will follow this news release with a video presentation for the public in the coming days that will provide encouraging comparisons with other notable Athabasca basement-hosted, high-grade Uranium deposits, such as 1) NexGen Energy’s (TSX:NXE) Arrow deposit, and 2) Denison Mines (TSX:DML) Gryphon deposit. The video presentation will also highlight the significance of elevated Cobalt, Copper, and Nickel intersected within the drill hole, as well as the extent and meaning of anomalous Boron, Lithium and Vanadium within the massive alteration halo.

Assay results from the remaining drill holes (AK21-02A to AK21-04) completed on ACKIO in the summer program will be released after they’ve all been received, quality checked, and approved by the Company’s technical team.

Planned Winter Drill Program on ACKIO

Baselode is planning for a 10,000 metre diamond drill program on the ACKIO discovery to begin in mid- to late-January. Drill holes will be planned to intersect mineralization along strike and dip, which remains open in all directions, and to test for unconformity-style of mineralization. The drill program will be operated with helicopter support to lessen any ground-induced environmental impacts within the project area.

ACKIO is located 30 km southeast of well-established infrastructure including an all-season road and powerline that runs between Cameco Corp.’s (TSX: CCO) and Orano’s McArthur River mine and Key Lake Uranium mill joint ventures. ACKIO is located 70 km northeast of the Key Lake mill.




BASELOAD is fully funded! IMHO load up at this price! Looks like Sykes & team have found some U!


Chico