Much work also completed to bring the Wells to production, such as :
** Tank batteries were repaired and alterations were made to accept high volumes of fluids from the Well reworks.

** New Tubing, rods, and pumps installed. Wells were acidized to increase fluid entry to wellbore.

** A 160 long stroke pumping unit was installed and wells readied for production.

** Saltwater disposal pumps were installed and everything is fully operational.