Monday, July 05, 2021 1:26:54 PM
- Main Zone returns 4.08 g/t Au over 20.85m further defining high grade mineralization south of mine workings.
Thunder Bay Ontario, July 05, 2021 - Metals Creek Resources Corp. (the “Company” or Metals Creek, TSXV: MEK, OTCQB: MCREF, FRA:M1C1) is pleased to announce diamond drill results for drill hole DL21-014 from the phase II diamond drill program at the Dona Lake Gold project (See News Release November 18, 2020).
Drill hole DL21-014 intersected the Main Zone at approximately 427m below surface and returned a core length intercept of 13.1 grammes per ton (g/t) gold (Au) over 2.00 meters(m) (460.00 – 462.00m). This was a part of a broader zone of mineralization of 4.08 g/t Au over 20.85m (460.00 – 480.85m). (See Table 1 Significant Results). Mineralization is hosted within silicate-sulfide iron formation and characterized by stringer to disseminated pyrrhotite ranging from 3 to 12% with local pyrite. Sections of silicate-oxide iron formation with magnetite present. Alteration consists of moderate to strong hornblende, grunerite and garnets with strong folding. This intercept is located south of the mine workings between the 360and 455 level. Previously released holes DL21-07, 11 and 12 which are also south of the mine workings and between levels 360 and 455 in conjunction with hole DL21-014 continue to clearly demonstrate that high grade mineralization remains south of the mine workings above the 455 level.
Drilling has also successfully continued to delineate high grade mineralization below the 455 level along with further defining remaining high-grade mineralization south of the Dona Lake mine workings.
Future drilling will continue to target the down plunge extension of the mine stratigraphy and continue to build on recent success in delineating high grade mineralization remaining south of the mine workings as well as testing for any high-grade mineralization north of the mine workings.
Alexander (Sandy) Stares, President and CEO of the Company states “Drilling at Dona Lake continues to further define high grade gold mineralization remaining outside of the mine workings above the 455 level as well as extending the mine stratigraphy down plunge below the 455 level, which was the lowest most development at the Dona Lake mine. This drill program is now completed with results still pending which will be released once they are received and compiled.
Read & view drill results at:
https://www.metalscreek.com/july-5-2021
Recent MEK News
- TSX Venture Exchange Stock Maintenance Bulletins • PR Newswire (Canada) • 03/02/2024 03:56:00 AM
VHAI - Vocodia Partners with Leading Political Super PACs to Revolutionize Fundraising Efforts • VHAI • Sep 19, 2024 11:48 AM
Dear Cashmere Group Holding Co. AKA Swifty Global Signs Binding Letter of Intent to be Acquired by Signing Day Sports • DRCR • Sep 19, 2024 10:26 AM
HealthLynked Launches Virtual Urgent Care Through Partnership with Lyric Health. • HLYK • Sep 19, 2024 8:00 AM
Element79 Gold Corp. Appoints Kevin Arias as Advisor to the Board of Directors, Strengthening Strategic Leadership • ELMGF • Sep 18, 2024 10:29 AM
Mawson Finland Limited Further Expands the Known Mineralized Zones at Rajapalot: Palokas step-out drills 7 metres @ 9.1 g/t gold & 706 ppm cobalt • MFL • Sep 17, 2024 9:02 AM
PickleJar Announces Integration With OptCulture to Deliver Holistic Fan Experiences at Venue Point of Sale • PKLE • Sep 17, 2024 8:00 AM