InvestorsHub Logo
Followers 21
Posts 4569
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Monday, 06/07/2021 3:06:26 PM

Monday, June 07, 2021 3:06:26 PM

Post# of 120
Metals Creek Reports 5.49 g/t Gold over 8.7 Meters in Main Zone at Dona Lake

Main Zone returns 3.04 g/t Au over 25.05m including 5.49 g/t Gold over 8.7m

Drilling continues to demonstrate potential for High Grade Mineralization south of mine workings

Thunder Bay Ontario, June 07, 2021 - Metals Creek Resources Corp. (the “Company” or Metals Creek, TSXV: MEK, OTCQB: MCREF, FRA:M1C1) is pleased to announce diamond drill results for three drill holes from the ongoing phase II diamond drill program at the Dona Lake Gold project (See News Release November 18, 2020).

Drill hole DL21-012 intersected the Main Zone at approximately 410m below surface and returned a core length intercept of 5.49 grammes per ton (g/t) gold (Au) over 8.70 meters(m) (449.00 - 457.70m). This was a part of a broader zone of mineralization of 3.04 g/t Au over 25.05m (439.85 - 464.90m). (See Table of significant results Below). Mineralization is hosted within silicate-sulfide iron formation and characterized by stringer to disseminated pyrrhotite ranging from 3 to 15% with local pyrite as well as sections of silicate-oxide iron formation with magnetite comprising10-25% of unit. Alteration consists of moderate to strong grunerite, hornblende and garnets with strong folding also present locally. This intercept is located south of the mine workings between the 360 and 455 levels and located 15m north of hole DL21-007 (See News Release March 29, 2021) (See figure 1). Hole DL21-012 along with hole DL21-007 continues to demonstrate the potential for high grade gold mineralization south of the mine workings.

Read & view drill table & grphics at:
https://www.metalscreek.com/june-7-2021

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent MEK News