An Excerpt from your 12/26/17 post #32008:

"There is one good piece of news: OPPD (the local power supplier) is on top of this. A year or two ago they issued a contract to an Engineering firm. They did the design of the power line to the plant. It will be a 171kv line and come from a 171 Kv substation near Auburn. The routing, the design of the line, and most of specs needed for purchasing should be complete. It will require 171 Kv breakers and a 171Kv/13.8 Kv transformer."