MB operating drilled a well on my farm in 1991 , the move started about 9:00AM on a Sunday morning and the rig was up and running at 5:00 the same day . The rig was a mobil rig mounted on a semi trailor just like the one RECO is using but not quite as big . Reco would have 3 drill pipe loads and probably 2 mud pumps . For my well 1 drill pipe load and a large air compressor as this was a air rig and could easy do 1000 feet a day and operator house . RECO also had about two loads for mud screening [ have to see what you are drilling threw ] RECO drilling would take much longer as they were coring many times when drilling the well .
The RECO was done reported April so it was done before then , i say bullshit that the rig was just sitting there doing nothing
JMHO
FEATURED POET Announces Design Win and Collaboration with Foxconn Interconnect Technology for High-speed AI Systems • May 14, 2024 10:09 AM
FEATURED Element79 Gold Corp Reports Exceptionally High-Grade Results from Lucero • May 14, 2024 7:00 AM
VAYK Added New Manager for Expansion into $64 Billion Domestic Short-term Rental Market • VAYK • May 14, 2024 9:00 AM
Avant Technologies Equipping AI-Managed Data Center with High Performance Computing Systems • AVAI • May 10, 2024 8:00 AM
VAYK Discloses Strategic Conversation on Potential Acquisition of $4 Million Home Service Business • VAYK • May 9, 2024 9:00 AM
Bantec's Howco Awarded $4.19 Million Dollar U.S. Department of Defense Contract • BANT • May 8, 2024 10:00 AM