Looks like it’s not too far away...

The drill rig began drilling the well at 03:38 on March 10 and will initially be drilled to 1,500 feet at which point surface casing and blow-out preventer will be installed. This is due to take a week, before drilling then resumes down to a maximum target depth of around 6,000 feet. That phase of drilling will last for three to five days.