InvestorsHub Logo
Followers 21
Posts 4570
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Monday, 01/18/2021 9:17:19 PM

Monday, January 18, 2021 9:17:19 PM

Post# of 84
Jervois to integrate Pressure Oxidation Leach Circuit into SMP Refinery

January 18, 2021

Highlights

- Flowsheet optimisation for Jervois’ São Miguel Paulista nickel-cobalt refinery determines integration of a pressure oxidation (“POX”) leach circuit
- POX leach circuit will debottleneck capacity and provide greater flexibility to refinery feed options
- Jervois plans to process sulphide concentrate from its Idaho Cobalt Operations (“ICO”) in the United States as well as third-party concentrates
- Jervois is in discussions with potential third-party suppliers
- ICO remains on schedule for initial production from mid 2022; site construction adjusted to separated concentrate products to maximise optionality of SMP Refinery copper capacity, and enhance restart economics
- Jervois on track to become a vertically integrated producer capable of refining cobalt and nickel.


Read much more at:
https://mailchi.mp/3906c7eb20e6/engineering-contracts-for-ico-and-smp-nickel-cobalt-refinery-4798741?e=48b5acd3da
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent JRV News