Looking good!
Assay results have now been received from the final drill holes RD-06-149, 156 to 160 from the Creek Zone. All of the holes intersected the target massive sulphide mineralization between 50 and 100 meters down dip from the 2 meters wide surface showing, which assayed 22.5% Zinc and 6.2% Lead as reported in the Company's News Release dated November 9, 2006. The significant results are summarized in the following table.
HOLE NUMBER FROM TO INTERVAL (m)(m)(m) ZINC% LEAD%
---------------------------------------------------------------------
RD-06-149 47.62 58.26 10.64 13.26 2.87
---------------------------------------------------------------------
RD-06-156 72.74 73.49 0.75 12.88 3.17
---------------------------------------------------------------------
RD-06-157 74.0 80.12 6.12 7.08 1.55
---------------------------------------------------------------------
RD-06-158 63.42 71.83 8.41 6.07 1.82
---------------------------------------------------------------------
RD-06-159 51.93 61.92 9.99 4.51 1.07
---------------------------------------------------------------------
RD-06-160 55.34 60.47 5.13 21.27 4.61
The SEC Must Go!
And jail shorters.