InvestorsHub Logo
Followers 21
Posts 4599
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Wednesday, 12/16/2020 9:39:23 AM

Wednesday, December 16, 2020 9:39:23 AM

Post# of 247
American Creek's JV Partner Tudor Gold Intersects at the Goldstorm Zone, Treaty Creek, Located in B.C.'s Golden Triangle
1.215 gpt AuEq over 354.0 Meters Within 1225.5 Meters of 0.702 gpt AuEq (Hole GS-20-94)
and
1.078 gpt AuEq over 345.0 Meters Within 921.0 Meters of 0.821 gpt AuEq (Hole GS-20-83)


Cardston, Alberta--(Newsfile Corp. - December 16, 2020) - American Creek Resources Ltd. (TSXV: AMK) ("the Corporation") is pleased to present results for the fifth set of diamond drill holes for the Goldstorm Zone at their flagship property, Treaty Creek. The project is located in the heart of the Golden Triangle of northwestern British Columbia and is on-trend from Seabridge's KSM Project located five kilometers southwest of the Goldstorm Zone. Results from 12 diamond drill holes have recently been received from MSA Labs with final results from another 11 diamond drill holes pending. All drill holes have successfully intersected the Goldstorm System, expanding and defining the mineralization along the northeast and southeast axes, as well as to depth. The Goldstorm System 300 Horizon has now been traced for 1100 meters along the northeast axis and, as well, the CS-600 and DS-5 zones have been expanded to the northeast and to depth. All 39 drill holes completed at Goldstorm during the 2020 program have encountered significant precious metal mineralization. The 2020 Treaty Creek Diamond Drill Program was completed last week, and field personnel have winterized the camp. The track-components of two track-mounted diamond drills remain on site ready for start-up of the 2021 exploration season.

Tudor Gold's Vice President of Project Development, Ken Konkin, P.Geo., states: "We are very pleased with the results obtained from all 39 drill holes completed this year to-date and we anticipate the release of the final 11 holes of the year within a few weeks. This brings the total to 50 drill holes that were completed this year at the Goldstorm Zone. These latest holes continued to expand the limits of the mineralized targets along the northeastern and the southeastern axes, and to depth. For a fifth consecutive press release, we have surpassed our best result from last years' drill hole program (0.697 AuEq over 1081.5 meters in hole GS-19-47) with drill holes GS-20-83 and GS-20-94 as described in the headline. The final 11 drill holes represent over 9600 meters of drilling and we expect that MSA Labs will complete the analysis of these final samples as soon as possible."

Treaty Creek Highlights include:

- Twelve drill holes presented in this press release total 11,551.1 meters.
- The best results were from GS-20-94, a near-surface 354.0 meter intercept (36.0-390 m) averaging 1.215 gpt AuEq and GS-20-82 with a 351m intercept (113.0-464.0 m) averaging 1.051 gpt AuEq. Both holes are located on Section 111+00 NE.
- Equally impressive was drill hole GS-20-83 that also had a near-surface intercept over a similar 345.0 meters (73.5-418.5 m) that averaged 1.078 gpt AuEq on Section 112+50 NE.
- More Core Drilling did an excellent job completing 50 HQ/NQ2 diamond drill holes totaling 43,972 meters at Goldstorm and 1,636 meters at the Perfect Storm Target with three drill holes.

Read more and view drill core table and graphics at:
https://us5.campaign-archive.com/?e=6f11d69fd1&u=af629dcbbf88a5932a7e484e3&id=6049d7d5e1