$BCCEF Great PR today: BacTech Ships Concentrate Samples for Assay Ranging from 20 to 60 Grams Gold per Tonne
(via TheNewswire)




Toronto, Canada -TheNewswire -September 22, 2020-BacTech Environmental Corporation("BacTech or the Company") (OTC:BCCEF) (CSE:BAC)(CNSX:BAC.CN)today provided the following update on its Ponce Enriquez, Ecuador project.

As previously reported, a total of 6, 10-kilogram (22 lbs) concentrate samples were collected from 6 different processing plants around Ponce Enriquez. There are over 90 different processors in the area producing anywhere from 1 to over 20 tonnes per day of concentrate that contain high gold and arsenic values. The output is generated by both mine owners as well as small miners who deliver mineralized material for processing.

The gold grades of the 6 concentrate samples, as stated by the processors, ranged between 20 (.64 opt)and 60 (~2 opt) grams per tonne with arsenic values above 10% per tonne.

From the 6 collected concentrate samples, 3 arsenical refractory gold samples will be prepared and subjected to bioleaching and cyanidation testing. Two of the concentrate samples are Carbon-In-Pulp ("CIP") residues and the third is a blend of flotation concentrates that have not been previously contacted with cyanide. Regrinding and washing of the cyanide residues will be undertaken to remove traces of cyanates before bioleach testing and to avoid toxicity issues.

Given the presence of high levels of arsenic, the producers in Ponce Enriquez are subjected to a heavy discount in the prices they receive for their gold. A survey conducted by the Company would suggest that producers are paid approximately 65% of the gold value in the concentrate. The majority of the discounted high-grade gold/arsenic concentrates are bought by Asian smelters or roasters and shipped there for processing. For comparison, processors ofoxidematerial in Peru pay roughly 90% of the contained gold value.

BacTech's plan is to build a 50 tpd bioleach plant capable of treating high gold/arsenic material in Ponce Enriquez. A 50 tpd plant, processing 1.5 ounces of gold per tonne of feed, would produce approximately 26,000 ounces per year. The plants are modular and can be expanded without affecting the ongoing production.

ABOUT BACTECH

BacTech is promoting the use of its proprietary bioleach processing technology to treat historic arsenopyrite concentrates and tailings produced in the Ponce Enriquez area of Southern Ecuador.

For further information contact: Ross Orr, President & CEO, BacTech Environmental Corporation/ 416-813-0303 ext. 222, Cell 416-346-5529 and Email:borr@bactechgreen.com

Website:www.bactechgreen.com

Follow us on:

Facebook http://www.facebook.com/BacTechGreen Twitterhttp://twitter.com/BacTechGreen

LinkedIn http://www.linkedin.com/company/1613873 Vimeo http://vimeo.com/bactechgreen YouTube http://www.youtube.com/user/bactechgreen

My posts are my opinion, do your own DD, the stock market is risky, don't spit into the wind, keep hands and feet inside the ride.. etc. etc.

Join InvestorsHub

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.