InvestorsHub Logo
Followers 0
Posts 65
Boards Moderated 0
Alias Born 01/19/2016

Re: mr_sano post# 49257

Friday, 12/06/2019 11:06:39 AM

Friday, December 06, 2019 11:06:39 AM

Post# of 57170
NO set back READ THIS


Shannon Rasmussen, Vice President of Engineering, commented, "As we prepare to resume AOT demonstration testing, we are pleased to provide an update on the status of the upgraded equipment. The new high-capacity power supply and parts for the planned AOT internal grid pack modifications arrived at the demonstration site on schedule in late November. Installation of the modified grid pack was completed earlier this week. Modifications have been completed to the electrical skid and controller cabinets, increasing both electrical and cooling capacity. Final installation of the new power supply in the modified cabinets should be completed next week upon delivery of the final components required to complete the electrical connections and control interface. Assuming these final components are delivered on schedule, we remain on track to complete recommissioning of the AOT unit and resume demonstration testing before the end of this year."
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent QSEP News