InvestorsHub Logo
Followers 19
Posts 2606
Boards Moderated 1
Alias Born 03/24/2007

Re: gitreal post# 33986

Friday, 11/29/2019 6:45:41 AM

Friday, November 29, 2019 6:45:41 AM

Post# of 47639
I'm certain that with all of the engineering expertise at the site, an elaborate French drain system has been installed. After all, heavy rains there are relatively common and Mexus ALWAYS prepares for any contingency. That being said, a flood would provide another perfect excuse for a paltry "production" figure.