InvestorsHub Logo
Followers 7
Posts 810
Boards Moderated 0
Alias Born 03/13/2005

Re: Wakebe post# 422

Monday, 11/18/2019 11:33:28 AM

Monday, November 18, 2019 11:33:28 AM

Post# of 854
They can not run any piping do any drilling (water well) nor put in any power lines or polls prior to permitting. I am sure they are laying the plot work. They are just not allowed to disturb the environment without permits. Most of these type operations will build their own power station on site. Probably a diesel generator.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SILEF News