InvestorsHub Logo
Followers 11
Posts 3034
Boards Moderated 0
Alias Born 12/01/2002

Re: borusa post# 150673

Thursday, 10/17/2019 5:00:55 PM

Thursday, October 17, 2019 5:00:55 PM

Post# of 151646
That is not inconsistent with my earlier claim that 7nm is limited by EUV steppers. I suspect each INTC factory will need between 50 and 100 steppers. The total ASML output is only 30 steppers this year (2019), split between INTC, Samsung and TSMC. I suspect D1X has enough room for all the steppers ASML can ship in 2020. Fab 42 should be ready for stepper installs by 2021.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent INTC News