InvestorsHub Logo
Followers 21
Posts 4544
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Monday, 09/30/2019 11:36:25 AM

Monday, September 30, 2019 11:36:25 AM

Post# of 241
American Creek Reports Composites on Treaty Creek Drill Holes Including GS19-48 (838.5m @ 0.728 g/t Gold) and GS19-49 (1081.5m @ 0.589 g/t Gold Including an Upper Interval of 301.5m @ 0.828 g/t Gold) Located in British Columbia's Golden Triangle

Cardston, Alberta--(Newsfile Corp. - September 30, 2019) - American Creek Resources Ltd. (TSXV: AMK) ("American Creek") ("the Corporation") is pleased to announce composite results from JV partner Tudor Gold's ongoing drill program being conducted at the Treaty Creek Project located in the Golden Triangle of NW British Columbia. As announced on September 23, 2019 we now have results from two deep vertical diamond drill holes (drilled to a depth of over 1,000m) and four definition drill holes. All six holes intercepted significant gold mineralization over wide intervals at the Goldstorm Zone.

Goldstorm Extension

Hole GS19-47 was drilled as a 150m step-out from hole GS19-42 (reported July 30, 2019 averaging 0.683 g/t Au over 780m) and was drilled vertically to a total depth of 1,199m, ending in mineralization. The hole contains strong stockwork with gold-bearing mineralization accompanied by significant base-metal disseminated sulphide mineralization averaging 0.589 g/t Au over 1081.5m including an upper interval of 0.828 g/t Au over 301.5m and a lower interval of 0.930 g/t Au over 207 m. The hole was stopped in mineralization due to the drill rig reaching its depth limitation, however, casing was left in the hole for possible continuation next year.

This 150 meter step-out hole confirms that the Goldstorm system is gaining strength to the northeast. With this strongly mineralized intercept, the Goldstorm Zone has been extended by a total of 300m this year from the best hole drilled in 2018 (CB18-39, averaging 0.981 g/t Au over 563.8m) and has now been traced along strike for over 800 meters.

Goldstorm Definition Drilling

A second deep vertical hole, GS19-48, was drilled to a total depth of 1035m from the same pad as CB18-39 (drilled in 2018). The results exhibit excellent continuity of mineralization between holes and this drill hole returned 0.725 g/t Au over 838.5m, including a near surface interval of 328.5m averaging 1.048 g/t gold Au.

Four footwall definition holes (GS19-43 to GS19-46) drilled on section 109+00 NE, were successful in extending the width of the mineralized zone, to the southeast into the footwall of the controlling fault structure.

Hole GS19-43 returned an average of 0.566 g/t Au over 493.5m;
Hole GS19-44 returned an average of 0.807 g/t Au over 267m including 1.065 g/t Au over 150m;
Hole GS19-45 returned an average of 0.719 g/t Au over 325.5m including 1.000 g/t Au over 173m.
Hole GS19-46 returned an average of 0.510g/t Au over 594m including 0.734 g/t Au over 162m.


Read more at:
https://www.americancreek.com/index.php/news/news-2019/434-