InvestorsHub Logo
Followers 1264
Posts 10395
Boards Moderated 1
Alias Born 11/19/2013

Re: None

Thursday, 08/29/2019 3:36:14 AM

Thursday, August 29, 2019 3:36:14 AM

Post# of 9961
Sounds like hints towards production starting to me : :)

"We continue to work with our mining operations and safety consultant, Jason Owens, of Australia. Jason and Dan Hally are focused on the development of an operational plan to move the project effectively and efficiently into production on a small scale of approximately 20 tons per day. Their work includes researching and obtaining cost estimates on portable crushing and milling equipment that will enable a movement into production significantly sooner than focusing on a large operation. Mr. Hally has located the vein structure the original mining engineer J.A Czizek had described as being a location for a new adit. This location is approximately 200 feet below the elevation of the current adit and is easily accessible by the existing road. The lower landing has been cleared and enlarged during previous work to allow equipment in this area of the property. Work planed for September of this year will include significant sampling at this location. The plan should a new adit prove to be feasible is to open a new adit and ramp downward following the vein structure. The original workings included a tunnel approximately 1000 feet in length with historical records indicate produced ore running an average of 2.25 ounces of gold per ton and significant amounts of silver. The new tunnel would provide the opportunity to continue to mine the same structure at a greater depth."

Army Veteran. 11 year OTC trader. Creator of 30-30-40 Trading Rule. Pioneer of OTC institutional portfolio integration. CEO of sunnymoneyfamily.com.