InvestorsHub Logo
Followers 36
Posts 1514
Boards Moderated 0
Alias Born 08/19/2000

Re: TRAPPER JIM post# 36809

Tuesday, 08/20/2019 9:34:38 AM

Tuesday, August 20, 2019 9:34:38 AM

Post# of 55227
$69,106,382.16 from one mining operation

II. Diamonds and Gold - Jequitinhonha River Valley Land Bank

Minerals: Gold, Diamonds, Sand (for construction)

Location: Olhos-d'Água and Diamantina , state of Minas Gerais

Area: 26,645 acres The NI 43-101 report describes the existence of mineralized materials amounting to 1,639,200 cubic meters with the following concentrations: 0.16 carats of diamonds per cubic meter and 182 milligrams of gold per cubic meter.

That's roughly 6 cubic meters per diamond carat.
1639200/6 = 273200 carats and I used $200 dollars per carat (your number may vary). So the yield would be $54640000.00

For the gold in the ground.
((1639200 x 182mg)/1000mg/gm)/31.013grams = 9614.387 ounces of gold
9614.387 x 1504.66 dollars per ounce (before costs) = $14,466,382.16.

Total would be 54640000 + 14466382.16 = $69106382.16 in the ground not including inferred in the ground.

I do not provide investment advice. This post is my personal opinion.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent ATLX News