InvestorsHub Logo
Followers 1082
Posts 110157
Boards Moderated 53
Alias Born 11/22/2003

Re: None

Wednesday, 07/24/2019 1:29:30 AM

Wednesday, July 24, 2019 1:29:30 AM

Post# of 8
Sandspring Announces Filing of Preliminary Economic Assessment Report for Toroparu Project
V.SSP | 16 hours ago
DENVER and VANCOUVER, British Columbia, July 23, 2019 (GLOBE NEWSWIRE) --

Sandspring Resources Ltd. (TSX Venture: SSP, OTCQX: SSPXF) (“Sandspring”, or the “Company”) is pleased to announce its filing of the Preliminary Economic Assessment Report (the “PEA” or “PEA Report”) for its Toroparu Gold Project in the Mazaruni-Cuyuni District of Guyana (the "Toroparu Project" or “Project”). The PEA Report was prepared in accordance with National Instrument NI43-101 by SRK Consulting (US) Inc. ("SRK") and has been filed on SEDAR and the Company’s website.

The results of the PEA were announced by the Company in its press release (the “June 4 Press Release”) dated June 4, 20191. SRK concludes in the PEA Report that “Given the positive results of the PEA, SRK recommends that the Toroparu Project be advanced to a feasibility study. Given the previous studies already conducted on the Project this could be completed within a 6 to 9-month duration.”

The Toroparu Project has been re-scoped to include the Sona Hill satellite deposit, modification of the Project’s processing strategy to start with gold-only production from a Carbon-in-Leach circuit (“CIL”) for the initial ten years, followed by an expansion of the Project in year 11 to add flotation processing capacity and the streaming agreement with Wheaton Precious Metals International.2 The PEA Report summarizes the results of the re-scoping at base case metal prices of US3 $1,300 gold (Au), $16.00 silver (Ag), $3.00 copper (Cu).

The PEA documentation of mining production quantities supercedes and replaces the 2013 Prefeasibility Study (the “2013 PFS”) Statement of Mineral Reserves4.
The PEA is based on exploitation of measured, indicated and inferred mineral resources while the 2013 PFS is based on the exploitation of proven and probable mineral reserves.
Inferred resources from the Mineral Resource Estimate identified in the Company’s September 26, 2018 press release5 comprise 5% of the resources used in the production schedule reported in the PEA.

Rich Munson, CEO, stated, “As we noted in the June 4 Press Release, the re-scoping study supports the significant changes to the profile of the Toroparu Project that have occurred since the 2013 PFS was issued. As recommended by SRK, we are now working on final feasibility.”

About Sandspring
Sandspring Resources Ltd. is a Canadian junior mining company currently moving toward a feasibility study for the Toroparu Project in Guyana, South America. Sandspring and Wheaton Precious Metals (formerly known as Silver Wheaton) entered into a precious metals purchase agreement for the Toroparu Project in November of 2013. Sandspring also holds a 100% interest in the Chicharrón Gold Project located in the Segovia-Remedios mining district, Antioquia, Colombia. Additional information is available at
www.sandspringresources.com or by email at sandspringinfo@sandspringresources.com.

Visit Sandspring’s website at
http://www.sandspringresources.com

FOR FURTHER INFORMATION, PLEASE CONTACT:
Richard A. Munson
Sandspring Resources Ltd.
(303) 991-5683
sandspringinfo@sandspringresources.com

Additional information on Sandspring can be viewed on SEDAR under the Company's profile at www.sedar.com or on Sandspring's website at http://www.sandspringresources.com

This press release includes certain forward-looking statements concerning future performance and operations of the Company, including the expected positive results from the Toroparu Project based on the estimates and findings contained in the PEA, as summarized herein, as well as management's objectives, strategies, beliefs and intentions. Forward-looking statements are frequently identified by such words as "may", "will", "plan", "expect", "anticipate", "estimate", "intend" and similar words referring to future events and results. Forward-looking statements are based on the current opinions and expectations of management at the time such statements are made. All forward-looking statements and information are inherently uncertain and subject to a variety of assumptions, risks and uncertainties, including the speculative nature of mineral exploration and development, fluctuating commodity prices, changes in project parameters as plans continue to be refined, uncertainties of project cost overruns or unanticipated costs and expenses, uncertainties inherent in conducting operations in a foreign country, uncertainties related to the availability and costs of financing needed in the future, the risk that the conclusion of pre-production studies may not be accurate, the Company's successful advancement of the Toroparu Project toward feasibility and obtaining positive results from ongoing evaluation and testing of multiple gold targets located elsewhere in the Company's landholdings, among other risks as described in our public filings available at www.sedar.com. Actual events or results may differ materially from those projected in the forward-looking statements and we caution against placing undue reliance thereon. Sandspring Resources Ltd. has an ongoing obligation to disclose material information, as it becomes available.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

__________________________
1 The Company issued a press release on June 4, 2019, which can be found at
www.sandspringresources.com and www.sedar.com.

2 The Company and Wheaton Precious Metals International Ltd. (“Wheaton”) entered into an Agreement (the (“Wheaton PMPA”) in 2013 which was amended in 2015. The Wheaton PMPA is available on http://www.sedar.com and
http://www.sandspringresources.com

3 All references to $ or dollars means United States Dollars.

4 A prefeasibility study was completed in May 2013 (NI 43-101 Technical Report, Prefeasibility Study, Toroparu Gold Project, Upper Puruni River Area, Guyana, dated May 24, 2013 by SRK Consulting (U.S.), Inc., and is available on SEDAR (www.sedar.com)).

5 The Company press released an updated Mineral Resource Estimate on September 26, 2018. The press release can be found at http://www.sandspringresources.com and www.sedar.com.

image: https://www.globenewswire.com/newsroom/ti?nf=NzY4MjEwOCMzMDQyNjE0IzIwOTIxNjE=


image: https://ml.globenewswire.com/media/9a1892c3-7778-446d-9b8d-e13330297513/small/sandpsring-logo-png.png

Primary Logo

GlobeNewswire
July 23, 2019 - 6:00 AM PDT
Tags:
INDUSTRIAL METALS & MINERALS

Read more at https://stockhouse.com/news/press-releases/2019/07/23/sandspring-announces-filing-of-preliminary-economic-assessment-report-for#Jv1dmb0Zw9yPvfoD.99


My opinions are my own and and DD I post should be confirmed as unbiased

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SSP News