The problem with KM was different, according to the filings.

The issue there was that the pipeline had been used for other things previously and it has carbon deposits on the walls, and these were dragged into the crude flux and were causing the shorting.

The issue with Transcanada was different yet again.

And the issue this time seems different *yet again*.

AISI does that seem about right to you?

However to me these episodes do highlight how significant the power component is to the entire technology the company is offering. It's not just the pressure vessel with metal baffles, but the infrastructure for powering it...