InvestorsHub Logo
Followers 0
Posts 44
Boards Moderated 0
Alias Born 11/24/2017

Re: None

Friday, 07/12/2019 10:39:43 AM

Friday, July 12, 2019 10:39:43 AM

Post# of 87
$MPC Marathon Galveston Bay refinery FCCU may be shut eight weeks - Reuters

The gasoline-producing unit at Marathon Petroleum's (NYSE:MPC) 585K bbl/day Galveston Bay Refinery in Texas may remain shut for 2-8 weeks for repairs, Reuters reports.

The 140K bbl/day gasoline-producing Fluidic Catalytic Cracking Unit 3 was shut on June 29 to repair a leak, according to the report.

To repair the sour water stripper, which removes ammonia and hydrogen sulfide discharged by FCCU 3, MPC may need to rebuild a needed transformer, which reportedly could take eight weeks; if a replacement can be purchased, the repairs may only last two weeks.

Galveston Bay is MPC's largest refinery and the second largest in the U.S.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent MPC News