InvestorsHub Logo
Followers 16
Posts 1147
Boards Moderated 0
Alias Born 12/20/2016

Re: mexico1 post# 2832

Friday, 05/24/2019 4:18:51 PM

Friday, May 24, 2019 4:18:51 PM

Post# of 3390
Lightbridge Corporation

Enclosure

Consensus summary of strengths and weaknesses identified:

Strengths: The approach proposed by the applicant is detailed, well thought-out, and includes logical schedule sequences to achieve the goals and objectives of the project. The parallel approach of developing a commercial capability while developing fundamental thermal-hydraulic and irradiation thermal performance information is an aggressive strategy which can provide a significant schedule advantage if executed successfully.

The proposed development of a metallic fuel with anticipated enhanced reactor safety, heat transfer properties, proliferation resistance, and load following capabilities addresses import gaps for improved fuel safety, performance, and economics, and improve deployment potential of advanced reactor designs.

The applicant has already made a significant private investment ($30M) in this effort prior to this proposal, and is proposing 45 percent cost share. As the applicant plans to make their product usable in the existing light water reactor (LWR) fleet, and in potential future LWR and water-cooled small modular reactor (SMR) designs, this proposal supports a key Government priority to support the existing nuclear fleet and advanced reactors.

The commercialization potential of this proposal is significantly increased through the engagement of an experienced fuel manufacturer, support of the potential end users, and the establishment of a utility advisory board. This advisory board, which includes nuclear utilities Exelon, Dominion Energy, Duke Energy and Southern Company, provides insight into the applicant's development program and increases the likelihood that the final fuel technology will meet specific domestic market needs and achieve commercialization.

Lastly, key personnel appear to have extensive experience in the nuclear industry and with fuel development. The team consists of a mix of industry, university and national laboratory personnel who have experience with large nuclear projects.

Weaknesses: The applicant does not provide adequate detail regarding activities and timelines that would be required to support the overall licensing and commercialization strategy, impeding the ability to assess whether any interruption of critical path items included in this scope would impact the applicant's ability to meet their goals.

While the proposal notes that the objective of this project is to enable a lead test rod (LTR) demonstration of the Lightbridge Fuel using uranium enriched to less than five percent uranium-235 in a commercial reactor in 2022, the proposal does not provide the expected level of detail regarding how these activities fit into an overall development and qualification strategy for their commercial HALEU fuel product.

Policy Factor: The proposal has merits as documented in the above summary; however, when considered in conjunction with the program policy factor, "the consistency and conformance of the work proposed in the application with current Office of Nuclear Energy Congressional appropriations," it was determined that the proposal could not be supported within currently available resources.


Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LTBR News