InvestorsHub Logo
Followers 30
Posts 3717
Boards Moderated 0
Alias Born 03/06/2011

Re: None

Friday, 03/29/2019 3:22:50 PM

Friday, March 29, 2019 3:22:50 PM

Post# of 47644
For any success best know some of what you speak. Any dump will consist of well sized ore on pad after next Monday.

I first saw that very crusher circuit looked much the same on Nov '11 visit to Ures and Elena claims. Was moved to restack Felix 500K ton pad 6 in late '12 for fresh leach producing PM in prep for sale $4 million to ATZEX other JV 50%.. Been in dry desert storage since. To me a very capable set up, oft rebuilt to specs by a master machine fabricator sure capable of accepting Elena 3/4" CRUSHED ore again to pad 1 with half load removed for a proper ore set up just as CEO states. For uninitiated it consists of the jaw crusher on left falling to the cone crusher in center up to the new installed mixer for lime input to assure proper pH and then on to 400' conveyor to begin fresh pad stack proper chemistry as determined for best leached product starting next Monday. Trust this improves poor vision somewhat. We majority accumulators do suggest PT use fresh lipstick on the old pig when Senorita Caborca cuts the gold ribbon at start up to become a fresh employer at union wages then on.

"I’m thinking that piece of trash crusher breaks down within a week though. Potential pump and dump coming".

http://mexusgoldus.com/wp-content/uploads/Santa-Elena-Cone-crushing-system.jpg