InvestorsHub Logo
Followers 7
Posts 1275
Boards Moderated 0
Alias Born 08/20/2012

Re: None

Thursday, 12/13/2018 10:52:38 AM

Thursday, December 13, 2018 10:52:38 AM

Post# of 47639
The results are right in line with the plan that they layed out

The purpose of the Core drilling stage is to follow at depth the surface expression of the Julio Vein and Shear zone and check all structural features and mineralization types in the rocks involved. First, holes 00- 04 it will be testing the extent depth of 50 meters, to check if the structure maintains a width of about 10 meters and the au-ag content. Then holes 05 and 06 will check the offset fault for mineralized pocket and breccia structures. Holes 05-08 will test the depth extent to 100 meters and au-ag content. This drilling will test a structure containing approximately 500 000 tons along 300 meters roughly north-south. It is very likely to average good gold grades as observed in a 25 meter deep inclined shaft where bonanza gold grades have been obtained from pillar samples.
The target at this stage would be 50 to 100 000 oz gold, with an average of 5 g/t Au.

It is everyone on this board that is cheerleading and dreaming up these big imaginative figures that gets everyone disappointed. 3 holes of 9. The other holes will be deeper. It looks like the vein starts around 25m for gold and increase as they move deeper to 39m.