CSE ASNT LINK
The Pitt Meadows Facility (Pitt Meadows, British Columbia)
The Pitt Meadows Facility is a 650,000 square foot facility on a 25 acre property with a
600,000 square foot greenhouse located within approximately ten (10) kilometres from the Maple
Ridge Facility. The Pitt Meadows Facility is approximately ten (10) years old, and consists of two
(2) adjoined greenhouses with a metal frame, multi-gable roof (Dutch "Venlo" style) structure with
single, 36 oz. glass panel walls and roof cladding, all on concrete perimeter and internal concrete
pier footings. The entire canopy is covered with over 4,000 hydroponic greenhouse high pressure
sodium lights, automated nutrient delivery equipment and environmental control systems. At full
production capacity, the Company anticipates that the Pitt Meadows Facility will be capable of
producing over one million grams of dried cannabis per week, with a substantial portion of the
harvested material destined as an input for extraction and product manufacturing. An application
for a license for the Pitt Meadows Facility has been filed with Health Canada and is in the late
stages of review.
VHAI - Vocodia Partners with Leading Political Super PACs to Revolutionize Fundraising Efforts • VHAI • Sep 19, 2024 11:48 AM
Dear Cashmere Group Holding Co. AKA Swifty Global Signs Binding Letter of Intent to be Acquired by Signing Day Sports • DRCR • Sep 19, 2024 10:26 AM
HealthLynked Launches Virtual Urgent Care Through Partnership with Lyric Health. • HLYK • Sep 19, 2024 8:00 AM
Element79 Gold Corp. Appoints Kevin Arias as Advisor to the Board of Directors, Strengthening Strategic Leadership • ELMGF • Sep 18, 2024 10:29 AM
Mawson Finland Limited Further Expands the Known Mineralized Zones at Rajapalot: Palokas step-out drills 7 metres @ 9.1 g/t gold & 706 ppm cobalt • MFL • Sep 17, 2024 9:02 AM
PickleJar Announces Integration With OptCulture to Deliver Holistic Fan Experiences at Venue Point of Sale • PKLE • Sep 17, 2024 8:00 AM