COMPLETE NONSENSE according to all the GEMS & FACTS from the latest 10Q filing. The below is more ACCURATE & FACTUAL about the PROVEN AOT & KINDER MORGAN. NEXT

In February 2016, the modified AOT equipment was installed at Kinder Morgan’s facility. Pre-acceptance testing was performed in April 2016, culminating in more than 24 hours of continuous operations. In-field viscosity measurements and pipeline data collected during this test indicated the AOT equipment operated as expected, resulting in viscosity reductions equivalent to those measured under laboratory conditions. Supervisory Control And Data Acquisition (“SCADA”) pipeline operating data collected by Kinder Morgan during this test indicated a pipeline pressure drop reduction consistent with expectations. Kinder Morgan provided the Company with a number of additional crude oil samples which were tested in the laboratory for future test correlation and operational planning purposes. Based on final analysis of in-field test results, SCADA operating data and subsequent analysis of crude oil samples at Temple University, Kinder Morgan and QS Energy are considering moving the AOT test facility to a different, higher-volume pipeline location.