InvestorsHub Logo
Followers 21
Posts 4618
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Thursday, 08/09/2018 11:18:24 AM

Thursday, August 09, 2018 11:18:24 AM

Post# of 37

August 9, 2018

Skeena Intersects 10.52 g/t Gold Over 4.10 Metres at Snip

Vancouver, BC (August 9, 2018) Skeena Resources Limited (TSX.V: SKE, OTCQX: SKREF) (“Skeena” or the “Company”) is pleased to report additional assay results for six drill holes from the Phase II underground drilling program at the Company’s 100% owned Snip Gold Project (“Snip”) located in the Golden Triangle of British Columbia.

The Phase II drilling program is now complete. A total of 9,583 metres was drilled over 48 underground drill holes and two surface drill holes. Building upon the data gathered from the Phase I campaign, the Phase II program was designed to expand newly modelled zones via widely spaced exploratory drill step-outs, further delineate known mineralization in areas of low drilling density and validate the historical data in preparation for a maiden resource estimate at Snip. A reference mine section is presented at the end of this release, and on the Company’s website.

Phase II Drilling Highlights:

11.03 g/t Au over 3.00 m (UG18-101)
185.00 g/t Au over 0.60 m (UG18-101)
23.84 g/t Au over 1.50 m (UG18-103)
17.93 g/t Au over 2.00 m (UG18-103)
8.68 g/t Au over 3.90 m (UG18-103)
10.52 g/t Au over 4.10 m (UG18-104)


Read More at:
https://www.skeenaresources.com/news/skeena-intersects-10-52-g-t-gold-over-4-10-metres-at-snip
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SKE News