InvestorsHub Logo
Followers 30
Posts 3717
Boards Moderated 0
Alias Born 03/06/2011

Re: None

Thursday, 04/05/2018 11:55:28 AM

Thursday, April 05, 2018 11:55:28 AM

Post# of 47675
Any who call will hear VAT trailer was required by Mexico to have some tires replaced after 1000 mi trip on US Interstates no troubles. Was done and expected to arrive today at Ures town compound while mine site is still prepped with protective film for VAT and plastic solution containers the leach will be MC processed from each 3 day load and drain. He flew down Tue to Ajo Air Port with a welder who will stay and construct the follow on VAT tanks on site with no transport needed. Stayed overnight at Caborca for needed biz meets and on to Hermosillo today and remain to work Ures to initial product. BTW he and PT Jr completed a water tank to be placed on a truck chassis and driven down for Ures site use. Making low cost to own specs is not exactly a humorous chuckle thing for a CEO's abilities. Very last water truck the tank company made drove a load of water to Caborca in '11 and just stayed at the mine until it wore out. This is the next one constructed at Walnut Grove 7 years later for now for Ures as well.