InvestorsHub Logo
Followers 1
Posts 42
Boards Moderated 0
Alias Born 09/02/2009

Re: None

Thursday, 01/25/2018 9:30:11 AM

Thursday, January 25, 2018 9:30:11 AM

Post# of 193
Hunt Mining Announces Blast Hole Drilling Results at Martha Project

LIBERTY LAKE, Wash., Jan. 24, 2018 (GLOBE NEWSWIRE) --

Hunt Mining Corp. (the “Corporation” or “Hunt”) (TSX VENTURE:HMX) (OTC:HMXZF) is pleased to announce drill results from drilling activities at the Martha mine located in the Santa Cruz Province, Argentina. Hunt continues to investigate the mining of pillars at the Martha mine, which was brought into production in January 2017.

Hunt recently completed surface blasthole drilling, designed to blast portions of the mineralized hanging wall and footwall into the existing open stope. A total of 19 holes were drilled, with highlighted results above 400 g/t (not pertaining to internal dilution) as follows:

2018 Blasthole Drilling Highlights

HOLE NO FROM TO SAMPLE NO AG G/T
520N-001 10 12 111722 436.6
520N-001 12 14 111723 1194.8
520N-001 14 16 111724 323.7
520N-001 16 18 111725 1384.5
520N-001 18 20 111726 680.2 Breakthrough into stope at 22m
520N-002 8 10 111732 809.7
520N-002 10 12 111733 2582.0
520N-002 12 14 111734 408.1
520N-002 14 16 111735 205.7
520N-002 16 18 111736 1917.2
520N-002 18 20 111737 1531.8 Breakthrough into stope at 21m
520N-120 14 16 111871 2500.5
520N-120 16 18 111872 10889.9
520N-120 18 20 111873 7465.3
520N-120 20 22.2 111874 15984.7 Breakthrough into stope at 22.2m
520S-004 26 27 111906 6545.0
520S-004 27 28 111907 26412.0 No breakthrough into open stope
520S-005 30 31 111890 5115.8
520S-005 31 32 111891 7040.1 No breakthrough into open stope
https://globenewswire.com/news-release/2018/01/24/1304195/0/en/Hunt-Mining-Announces-Blast-Hole-Drilling-Results-at-Martha-Project.html