Saturday, December 09, 2017 6:39:03 PM
Bottom line: Our projects will have 265% more output (and revenue) for only 5% more cost than Ashta.
The Ashta hydro project is self proclaimed as the "most successful concessionary hydropower project in Albania" (http://www.energji-ashta.al/?id=1). Ashta became operational in 2012, with an installed power of 53 MW, producing 242 KWh annually. Total investment was over 200 million Euro.
Our Shala and the unnamed "shovel ready" projects will have total installed power of 167 MW that will produce almost 643 KWh annually. Total investment will be 210 million Euro (http://www.3power-energy.com/images/announcement-2017.pdf). Note: while we've only been given output of 321 KWh on the main Shala project of 83 MW installed power, we can safely assume that the other 83 MW "shovel ready" project will provide similar output.
What does this comparison tell us? MORE BANG FOR THE BUCK! 265% more electricity to sell than Ashta (643 KWh vs. 242) for only 5% more investment (210M Euro vs. 200). This a HUGE return on investment compared to the "most successful hydro project in Albania" to date!
VHAI - Vocodia Partners with Leading Political Super PACs to Revolutionize Fundraising Efforts • VHAI • Sep 19, 2024 11:48 AM
Dear Cashmere Group Holding Co. AKA Swifty Global Signs Binding Letter of Intent to be Acquired by Signing Day Sports • DRCR • Sep 19, 2024 10:26 AM
HealthLynked Launches Virtual Urgent Care Through Partnership with Lyric Health. • HLYK • Sep 19, 2024 8:00 AM
Element79 Gold Corp. Appoints Kevin Arias as Advisor to the Board of Directors, Strengthening Strategic Leadership • ELMGF • Sep 18, 2024 10:29 AM
Mawson Finland Limited Further Expands the Known Mineralized Zones at Rajapalot: Palokas step-out drills 7 metres @ 9.1 g/t gold & 706 ppm cobalt • MFL • Sep 17, 2024 9:02 AM
PickleJar Announces Integration With OptCulture to Deliver Holistic Fan Experiences at Venue Point of Sale • PKLE • Sep 17, 2024 8:00 AM