InvestorsHub Logo
Followers 37
Posts 4427
Boards Moderated 0
Alias Born 08/05/2005

Re: certdog post# 88439

Sunday, 08/20/2017 12:28:35 AM

Sunday, August 20, 2017 12:28:35 AM

Post# of 105600
They might need an extra day or 2 for approval of the transfer.
http://fsims.faa.gov/wdocs/8900.1/v03%20tech%20admin/chapter%2034/03_034_001_chg_224a.htm

VOLUME 3 GENERAL TECHNICAL ADMINISTRATION

CHAPTER 34 CHANGES TO AIR CARRIER CERTIFICATE OR OPERATING AUTHORITY

Section 1 Air Carrier Mergers and theAcquisition of Air Carrier Operational Assets

3-3591 GENERAL. The number of new airlines starting operations since the Airline Deregulation Act of 1978 has increased significantly. As deregulation took effect (Circa 1983 and 1984), changing markets and intense competition caused an increasing number of air carrier mergers and sales of air carrier operational assets. This section provides direction and guidance and a process to follow when air carriers merge operations, acquire operational assets of another air carrier, or change ownership. These actions generally result in operational changes requiring various levels of Federal Aviation Administration (FAA) coordination and approval or acceptance of the changes before they can be implemented. For mergers and situations involving the acquisition of operational assets of another air carrier (acquisitions), the types of changes are normally characterized by the following.

· Changes in operational control systems and philosophy.
· Changes in programs or subsystems that are part of the operational control system.
· Revisions to manuals containing procedures for conducting various operations, maintenance, and inspection programs.
· Revisions to training curriculums and/or changes in employee qualification criteria for persons who will be conducting merged or new operations and/or programs.

A. Mergers and Acquisitions. These situations have a significant affect on FAA resources and it is imperative that they be handled efficiently and in a manner that ensures continued compliance with Title 14 of the Code of Federal Regulations (14 CFR) and safe operating practices. The FAA’s ability to effectively fulfill its responsibility concerning mergers or acquisitions is directly influenced by the following factors:

· Complexity of the affected operations.
· An air carrier’s timely notification to the FAA.
· The FAA’s early understanding of the changes that will result from the merger or acquisition.
· The certificate holder’s comprehension of the actions that must be taken to obtain FAA approval or acceptance of the consequent changes.
· The length of time available and sequence in which changes are to be implemented.

Indicates new/changed information.
B. Notification. One of the first steps in the merger/acquisition process should involve the certificate holder’s submittal of a transition plan for the merger/acquisition to the FAA for review and approval. The FAA will review the plan and, if determined to be acceptable, the FAA will sign and issue operations specification (OpSpec) A502 (Air Carrier Mergers and/or Acquisitions). A502 is a nonstandard, time-limited OpSpec that requires coordination with, and approval from, the appropriate headquarters (HQ) policy division. Upon receiving approval from HQ, principal inspectors (PI) will issue OpSpec A502 to each certificate holder involved in a merger and/or acquisition as a means of authorizing the plans for transition during the merger or acquisition process. Certificate holders involved in a merger and/or acquisition will lay out their plan for the transition that will occur throughout the merger and/or acquisition process by entering the appropriate information in specific sections of OpSpec A502.(PIs must review the guidance contained in Volume 3, Chapter 18, Section 3, Part A OpSpecs, OpSpec A502, for information on how to issue A502). FAA approval of a merger and/or acquisition transition plan ultimately occurs at the regional Flight Standards division (RFSD) of the certificate-holding district office (CHDO) who will have oversight responsibility of the surviving certificate holder in the merger/acquisition. The surviving certificate number (certificate designator followed by four additional characters, e.g. TWRA118A) identifies the surviving certificate holder, regardless of the surviving name chosen. Typically, the RFSD will form a Joint Transition Team (JTT) to manage the merger/acquisition. The RFSD of the surviving certificate holder will contact the Air Transportation Division (AFS-200) as soon as practicable upon the knowledge of the pending merger or acquisition, and ultimate selection of the JTT. The RFSD will provide AFS-200 with a point of contact (POC) for the merger or acquisition at this time. Although the overall merger/acquisition transition plan is approved at the RFSD level, OpSpec A502 must be approved by AFS-200 in coordination with the Aircraft Maintenance Division (AFS-300). FAA approval of a merger or acquisition plan is executed by the CHDO through the PI’s digital signature (representing the CHDO) in the automated Operations Safety System (OPSS) (Web-based Operations Safety System (WebOPSS)).

Indicates new/changed information.Indicates new/changed information.
C. Transition Plans. Situations involving mergers or acquisitions usually change the capability and character of the affected certificate holders. A transition period often follows when the original capabilities of the affected certificate holder will be in a state of change until new (different) capabilities have been established and stabilized. Regardless of the extent of change, the FAA has continuing responsibility for overseeing each certificate holder’s operation. These responsibilities can be more effectively managed if the FAA is fully aware of each certificate holder’s intentions during the transition period. Title 14 CFR does not require certificate holders to develop and provide a plan to the FAA. However, in most situations, changes to parts of an operation such as OpSpecs, training programs, maintenance programs, manuals, checklists, minimum equipment lists (MEL), recordkeeping, or flight control will require FAA approval or acceptance. The surviving certificate holder’s management personnel must be made aware that a transition plan outlining changes that require FAA approval or acceptance is necessary if the certificate holder’s schedules for obtaining appropriate approvals or acceptance are to be met. Until the surviving certificate holder makes these changes and obtains these approvals, it must continue to operate in accordance with current approvals. Continued safe operations can only be assured when conducted in accordance with a transition plan providing for orderly and realistic accommodation of the changes to be made. Transition plans for conducting operations during mergers or acquisitions should include the following:

Indicates new/changed information.
· An outline of changes to be made during the transition period that will require FAA approval.
· The surviving certificate holder’s best estimate of when it will implement changes. These estimates must be incorporated into the transition plan.
· A description of the interim methods and/or procedures that will be used during the transition period to ensure compliance with 14 CFR and safe operating practices until all changes are fully implemented.

Indicates new/changed information.
1) Mergers. When two or more certificate holders merge operations there will be significant and often complex changes to the capabilities and characteristics of one or more of the merging parties. Usually, all of the merging parties’ operations are changed to some extent. The transition plan must address the manner in which, and when, such items as certificates, OpSpecs, manuals, training programs, maintenance programs, and recordkeeping procedures will be merged. This plan should indicate a completion of all the merged items, so that at the end of the transition period the surviving certificate holder’s operation reflects only one operation.

2) Acquisitions. There are three types of acquisitions:

a) Acquisitions by holding companies (noncertificate holders) when the certificate holder continues to exist as an independent entity (subsidiary), are a type of acquisition that require little, if any, FAA action. Usually, few operational changes are made and development of a transition plan is not necessary.

b) Acquisitions that change personal or corporate ownership, but which do not change the capability or characteristics of the operation and do not make extensive changes in management personnel required by 14 CFR, generally require minimum FAA action. The affected certificate, OpSpecs, and manuals will need to be amended to show the new name of the certificate holder. A transition plan may not be necessary.

c) Acquisitions that involve the transfer of significant amounts of operational assets, including equipment and/or personnel, are similar to mergers. A transition plan must be developed in much the same way as a transition plan is developed for a merger.

Indicates new/changed information.
3-3592 THE PROCESS FOR HANDLING MERGERS AND ACQUISITIONS. The process for handling mergers or acquisitions follows the general approval/acceptance process described in Volume 3, Chapter 1, Section 1. The general principles and terms used in the generic process are applicable to the process described in the following paragraphs. For this discussion, “surviving certificate holder” identifies key management personnel of the organization that will hold the certificate that authorizes operations after a merger or acquisition.

3-3593 PHASE ONE.

A. Air Carrier and PI Responsibilities. Air carriers involved in a merger or acquisition should, on their own initiative, notify appropriate CHDOs of impending mergers or acquisitions. Affected CHDOs, however, may first learn of these impending actions through news media or other means. Within 5 working-days of becoming aware of an impending acquisition or merger, PIS shall contact their certificate holders to offer assistance in assuring continued regulatory compliance during any change. Although it may involve sensitive issues, the intent of this early contact is to establish a good working relationship that will help the air carrier ensure that aviation safety is not compromised during transition. Regardless of the means of notification, the affected CHDOs and their RFSDs must, as early as possible, make the following initial determinations:

Indicates new/changed information.
1) They must determine who the surviving certificate holder will be and where the principal base of operations will be located. These issues are normally resolved by the affected air carriers in the early discussion stages of a merger or acquisition. The affected CHDOs should discuss these issues with their respective certificate holder’s management as early as possible.

Indicates new/changed information.
NOTE: RFSDs and CHDOs are reminded that as far as the FAA is concerned, the surviving certificate holder is determined by the surviving certificate designator, regardless of the surviving name chosen.

Indicates new/changed information.
2) Affected CHDOs and assigned PIs must establish lines of communication. Once established, this communication should be maintained throughout the transition period to provide an ongoing dialogue between assigned PIs, district offices, and the regions. The regions shall keep AFS-200 and AFS-300 informed of the status of mergers or acquisitions. Affected CHDOs (when more than one office is involved) should fully coordinate their findings and use the results of these discussions as the basis for determining who the surviving certificate holder will be and where the principal base of operations will be located.

3) The RFSD must decide which district office will be the CHDO after the merger or acquisition. In making this determination, the considerations described in Order 8000.1 Volume 2, Chapter 1, Section 2 for assigning CHDO responsibilities must be applied. If the RFSD transfers CHDO responsibilities, the CHDOs should accomplish the same types of interdistrict office and inter-regional coordination, briefings, inspections, and transfer of operator files, as described in Volume 2, Chapter 1, Section 2.

Indicates new/changed information.
B. Initial Meeting. The assigned CHDO must schedule a meeting to brief the surviving certificate holder’s key management personnel of FAA requirements. The CHDO manager should ensure that the timing of this meeting is appropriate for the situation. When possible, the meeting should be scheduled before a merger or acquisition is formalized so that contingency planning can be initiated by the operator and the FAA. In other situations it may not be possible or appropriate to schedule the meeting until after the merger or acquisition has been formalized. Assigned PIs should prepare for and conduct the briefing. The certification job aids and the schedule of events may be useful in preparing for this briefing.

Indicates new/changed information.
1) The first item for discussion at the initial meeting should be verification of information provided to the CHDO when notified of the impending merger or acquisition. PIs should identify any changes to the information previously provided. If the surviving certificate holder has changed its initial planning information to the extent that determination concerning CHDO assignment is questionable, the RFSD must be promptly advised.

2) The CHDO shall inform the surviving certificate holder that it must develop a transition plan outlining proposed changes with estimates of when the changes will occur. The surviving certificate holder should submit this transition plan to the CHDO. The PI must brief the surviving certificate holder that the purpose of the plan is to:

· Provide an orderly approach during the transition period for making changes necessitated by the merger or acquisition.
· Provide a common basis of understanding between the certificate holder and the FAA of the changes to be made and when and how they will be made.
· Permit the FAA to coordinate its activities with the certificate holder’s activities so that the FAA can efficiently and promptly respond to requests for approval or acceptance of changes.
· Ensure continued compliance with regulatory requirements and safe operating practices during the transition.

Indicates new/changed information.
3) During the initial meeting, the surviving certificate holder must understand the kinds of information that should be included in the transition plan. The kind of information to be outlined is dependent on the type and complexity of the situation. PIs should request only information that they believe necessary for the situation. Figure 3-130 provides a Transition Plan Job Aid for inspector use. The following list gives examples of the kinds of information that should be addressed when appropriate to the situation. PIs should request any other kinds of information not included in the following list if, in their judgment, it is necessary.

a) The interim methods the air carrier will use.

b) To train crewmembers, dispatchers/flight followers, and ground personnel.

c) To keep these personnel current and qualified.

d) Air carrier’s plan to change the training or integrate training programs.

e) Air carrier procedures for scheduling crewmembers and ground personnel into changed or integrated training programs.

f) The maintenance programs and weight and balance programs the air carrier will use, and any interim procedures associated with these programs.

g) The air carrier’s plan to change or integrate maintenance and weight and balance programs.

h) Any interim recordkeeping methods and/or procedures the air carrier will use, to include:

· Training and qualification records
· Flight time, duty period, and rest records
· Trip records
· Maintenance records

i) The air carrier’s plan to change and/or integrate recordkeeping methods and procedures

j) An air carrier’s interim procedures for using general operations and maintenance manuals, checklists, MEL/Configuration Deviation List (CDL), airport analysis, emergency manuals and any other company manuals including planned changes and/or integration of these documents, methods which will be used to introduce crewmembers and ground personnel to changes in these documents, and any training to be given on these changed documents

k) An air carrier should request an amendment to its operations specifications (OpSpecs). Amendment requests should include any planned changes in authorizations, limitations, management personnel, and other areas affected by the merger as necessary. The air carrier must provide a schedule of the proposed changes in order to facilitate issuance of amended OpSpecs.

l) An air carrier’s interim methods and/or procedures for operational control including dispatch/flight release, weather and airport data, maintenance control, and control of contractual support.

m) An air carrier’s plan to change the systems, methods, and procedures used for operational control.

n) Any other changes the air carrier plans to make to the kinds of operations and areas of en route operations, including planned reductions, consolidations, expansions, and/or relocations of operations, equipment, and/or facilities.

Indicates new/changed information.
C. Transition Plan Development. PIs shall encourage the surviving certificate holder to consult with and solicit advice from PIs during development of the transition plan. In certain situations the surviving certificate holder may be reluctant to develop a transition plan for submission to the FAA. This reluctance could be based on concerns about the time and resources required to develop a plan, or whether the FAA will hold the operator to its proposals and schedules in an inflexible manner. In these situations, the surviving certificate holder shall be advised that without a transition plan the FAA will be unable to assign a priority to FAA attention on requests for approvals of changed programs or amendments to OpSpecs. The surviving certificate holder should also be advised that the FAA recognizes modifications to the transition plan and estimated schedules will often be necessary and, with appropriate notification of these changes, the FAA will respond in a timely manner.

D. Transition Plan Submission. PIs should encourage the surviving certificate holder to submit the transition plan to the CHDO as soon as possible so that the FAA may expeditiously begin planning its activities.

E. Increased Surveillance. If the surviving certificate holder refuses to submit a transition plan, the CHDO must implement a program of increased surveillance. Without a transition plan, continued compliance with regulatory requirements and safe operating practices can only be assured through increased surveillance. This increased surveillance must cover all aspects of the surviving certificate holder operation and the operations of other parties involved in the merger or acquisition. If the increased surveillance indicates any trends of noncompliance, PIs must request or conduct appropriate in-depth inspections as necessary to assure safe operations.

3-3594 PHASE TWO.

Indicates new/changed information.
A. Transition Plan Review. Phase two begins when the surviving certificate holder submits the transition plan. PIs must review the plan in detail during this phase. PIs should carefully consider the feasibility of the plan with respect to:

· Logical sequence of events and activities.
· Continued compliance with 14 CFR and safe operating practices.
· Completeness of events or activities.
· Inspector and other FAA resource availability.

Indicates new/changed information.
1) Logical Sequence of Events and Activities. Many events and activities outlined in the plan must occur before other events or activities. For example, if the surviving certificate holder plans on mixing flightcrews previously from different air carriers, certain training should be completed before mixing crews.

2) Continued Compliance with 14 CFR and Safe Operating Practices. The plan should outline methods or procedures to be used to ensure continued compliance with 14 CFR and safe operating practices. For example, previously approved MELs based on specified maintenance support procedures should continue to be used with the same specified maintenance procedures until the MEL is changed and approved. Another example would be a need for the separate airlines involved to keep separate recordkeeping systems and procedures until new methods and procedures are established and activated.

3) Completion of Events or Activities. The plan must indicate how and when an event or activity will be completed. For example, if the plan indicates that manuals will be changed, it must show that completed changes will be made to include removal of outdated material and erroneous references to nonsurviving entities or activities. It should indicate the date for completion of these types of events or activities. The transition plan should not outline “open-ended” events or activities. It should indicate a completion of the transition period or when all changes resulting from the merger or acquisition are scheduled to be completed.

Indicates new/changed information.
4) Inspector and Other FAA Resource Availability. During review of the transition plan, PIs should determine the availability and capability of inspector resources and develop plans and schedules accordingly. To be responsive to the surviving certificate holder’s needs, PIs will need to conduct timely evaluations of the changes outlined in the transition plan.

Indicates new/changed information.
B. Problem Resolution. PIs must determine whether the transition plan represents a feasible proposal. If significant deficiencies, omissions, or impractical proposals exist, the PIs should meet with the surviving certificate holder’s management and attempt to resolve these problem areas. If these problem areas cannot be resolved to the satisfaction of the PIs, the plan must be returned to the surviving certificate holder with a letter briefly describing the unsatisfactory areas. The letter should also explain that the FAA cannot accept the plan since it does not ensure continued compliance with 14 CFR and safe operating practices. A copy of this letter and the transition plan must be retained by the CHDO.

Indicates new/changed information.
NOTE: When a transition plan is returned because it does not ensure continued compliance, or when surviving certificate holders refuse to develop and submit a plan, the CHDO must initiate increased surveillance of all operations conducted by the surviving certificate holder. The PIs should consider requesting an in-depth inspection of that certificate holder (appropriately timed for the situation).

C. Transition Plan Acceptance. If the transition plan is acceptable, PIs should inform the surviving certificate holder of their acceptance, either verbally or by letter. Acceptance of the plan represents a commitment by the PIs to make reasonable efforts to accommodate the surviving certificate holder’s planned changes in a timely and responsive manner.

D. OpSpec A502 Issuance. When PIs accept a 14 CFR part 121 or 135 air carrier’s transition plan, the CHDO will forward a copy of the plan to AFS-200 and AFS-300, as appropriate, through the RFSD along with a request for permission to issue OpSpec A502. If the appropriate HQ policy division finds the plan to be acceptable and in the public interest, the HQ policy division will approve the CHDO to issue OpSpec A502. This is accomplished by the PI digitally signing the OpSpec and activating it in WebOPSS. See Volume 3, Chapter 18, Section 3, OpSpec A502, for guidance about issuing OpSpec A502.

E. Additional Guidance. When the direction and guidance provided in this order does not adequately address a situation, the CHDO manager shall forward a request for additional guidance through his RFSD to the Director, Flight Standards Service (AFS-1).

3-3595 PHASES THREE, FOUR, AND FIVE. As the certificate holder initiates changes in accordance with the transition plan, PIs must conduct evaluations of those changes in the same manner as other phase three evaluations of changes to a normal operation. If phase four demonstrations and inspections are required, they will be planned for and conducted in the same manner as normal operations. Procedures for approval or denial of the changes outlined in the transition plan are the same as other phase five approvals or denials. PIs must closely monitor the progress of actual events or activities presented in the plan. If the sequence of events or activities is advanced or delayed, PIs must consider the effect on other events or activities.

Indicates new/changed information.
3-3596 IN-DEPTH INSPECTION CONSIDERATIONS. In complex mergers or acquisitions, when extensive changes or integrations occur, PIs should consider requesting an in-depth inspection of the surviving certificate holder’s operation. This in-depth inspection should normally be planned towards the end, or after completion, of the transition period. The results of an in-depth inspection should indicate how effectively the transition plan was accomplished. It should also reveal any problem areas needing further attention.

NOTE: Regardless of the complexity of the situation, at any time during the transition period when continued compliance with 14 CFR or safe operating practices becomes questionable, the CHDO should conduct an in-depth inspection without delay.

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.