InvestorsHub Logo
Followers 75
Posts 794
Boards Moderated 0
Alias Born 05/14/2017

Re: Automa post# 109430

Wednesday, 08/16/2017 12:44:37 PM

Wednesday, August 16, 2017 12:44:37 PM

Post# of 207107
Thoughts on Floridany post and Long Star Connection.

Yes. I have noted all the Z's that appear out of place in the V9 page. IMO, they are computer generated images for advertising and promotional purposes. We saw the same thing with the JB&ZJMY named train. I don't know for sure, but Long Star may be trying to sell the V9 idea to JB&ZJMY, or it may just be in the infant stages of the V9 model so they use CG images for advertising to get a feel on the market before jumping all in. I don't know for sure.

Companies mock up photos for advertising or to sell an idea all the time. When the real JB&ZJMY named train photos/video came out, the final product was so much better than the mocked-up image.

The truth will come out and us longs will be "Free". Free from financial worries, free from bashers and free from the daily grind.

Initial "Photoshop", mock-up of the "JB&ZJMY" named train advertising.


Actual JB&ZJMY named train from video.


JB&ZJMY named train Video Link (post in Google Chrome and Translate)

http://www.jingtezmt.com/baorun/wap_doc/4809309.html

OEM MODEL

JB&ZJMY will be following an Original Equipment Manufacturer (OEM) model for production. ZJMY is contracting (or partnering) with Chery to produce the V3 SUV and bus bodies and chassis. Likewise, ZJMY is contracting (or partnering) with Long Star to produce the low speed EV bodies and frames along with several other models. ZJMY will provide: the battery, the electric motor, and other electric components.

By using existing production capabilities of Chery and Long Star, JB&ZJMY will save tens or hundreds of millions in investment and streamline the EV production process to months instead of years.

OEM Production Model advantages.

https://investorshub.advfn.com/boards/read_msg.aspx?message_id=133417174

From ZJMY (Wuhu) Business Plan in the above post:

To build a modern electric car manufacturing enterprises, need to invest hundreds of millions of dollars or even billions of dollars of funds, and the construction cycle also takes about 3 years to achieve mass production...




This is a must read to see the Long Star Connection.

Here is the Long Star-ZJMY connection DD.
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=133418280