![](http://investorshub.advfn.com/images/default_ih_profile2_4848.jpg?cb=0)
Tuesday, August 08, 2017 9:35:43 PM
https://www.geoilandgas.com/sites/geog.dev.local/files/arsb-og-001_rev_4.0_final.pdf
8.1.2 NDE
Suppliers, including sub-tier Suppliers, performing NDE shall be qualified in accordance with procedures and technical specifications applicable to GE Oil & Gas.
Submittal of procedures for review and approval may be required. This certification may be performed by a third party, as required by GE Oil & Gas.
8.2 Independent Validation / Certification
When required by equipment specification and data sheets, the Supplier shall engage a recognized independent Certification Authority (i.e. Lloyds, DNV, etc.) to certify equipment design and compliance to specified codes such as pressure vessels, heat exchangers, lifting equipment, etc. Material certification should have independent
verification indicating the scope of verification, including witnessed, reviewed, it shall be signed, dated, position of the representative, shall have official stamps.
8.3 Material Certification
The agreed levels of material certification for supplied items/parts shall be detailed within the approved MPP or within the ITP submitted for review after purchase order award or specified in the purchase order requirements. The Supplier shall ensure that these requirements are included in associated sub-orders and clarified with Suppliers.
Material test reports, certificates of compliance, type test certificates etc. as applicable for materials and items/parts of equipment within packages shall be made available for review (original or verified copies) at the package Supplier’s or sub-Supplier’s
works. Documents shall quote GE Oil & Gas purchase order and item/part numbers.
8.3.1 Certified Laboratories
GE Oil & Gas requires that certificates of conformity to GE quality requirements related to forgings must be issued by laboratories that meet the requirements of ISO17025 or equivalent or higher standards (NADCAP) for mechanical properties (the laboratories
GE Oil & Gas Quality Management System
Sourcing
Supplier Quality Requirements
ARSB-O&G-001
Rev: 4.0
GE PROPRIETARY UNCONTROLLED WHEN PRINTED OR TRANSMITTED ELECTRONICALLY PAGE 16 OF 46
g
OGQ-0101.1F Rev 1.1
need to be certified for each type of mechanical properties tests specified in GE specifications)
Additional requirements (like S-400) will be applicable when specified in
product/process specifications.
8.4 Material Traceability
Traceability is meant to ensure proper identification of finished products down to raw materials. Suppliers shall demonstrate effective material control procedures that, where specified, can trace materials from point of origin through stages of the manufacturing process through to acceptance by GE Oil & Gas. The Supplier material control system and traceability procedures shall be made available, upon request, for
review.
Recent SASI News
- Form D - Notice of Exempt Offering of Securities • Edgar (US Regulatory) • 03/06/2024 02:09:28 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 02/22/2024 09:20:29 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 02/12/2024 10:11:48 PM
- Form DEFA14A - Additional definitive proxy soliciting materials and Rule 14(a)(12) material • Edgar (US Regulatory) • 02/12/2024 02:01:27 PM
- Form DEF 14A - Other definitive proxy statements • Edgar (US Regulatory) • 02/09/2024 10:30:29 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/05/2024 01:25:51 PM
- Form PRE 14A - Other preliminary proxy statements • Edgar (US Regulatory) • 01/30/2024 11:12:15 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/30/2024 09:45:39 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/23/2024 09:15:49 PM
- Form 8-K/A - Current report: [Amend] • Edgar (US Regulatory) • 01/16/2024 09:30:35 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/16/2024 01:32:12 PM
- Form 8-K/A - Current report: [Amend] • Edgar (US Regulatory) • 01/10/2024 09:30:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/09/2024 10:00:16 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/04/2024 01:39:21 AM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 01/04/2024 01:38:26 AM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/03/2024 01:30:17 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/02/2024 10:20:32 PM
- Form DEFA14A - Additional definitive proxy soliciting materials and Rule 14(a)(12) material • Edgar (US Regulatory) • 12/07/2023 01:35:07 PM
- Sigma Additive Solutions Announces Filing of Definitive Proxy Statement Relating to Proposed Acquisition and Shareholder Vote • Business Wire • 12/07/2023 01:31:00 PM
- Form DEF 14A - Other definitive proxy statements • Edgar (US Regulatory) • 12/01/2023 11:03:17 AM
- Form 8-K - Current report • Edgar (US Regulatory) • 11/24/2023 09:05:37 PM
Green Leaf Innovations, Inc. Expands International Presence with New Partnership in Dubai • GRLF • Jun 24, 2024 8:30 AM
Bemax Inc. Positions to Capitalize on Industry Growth with New Improved Quality of Mother's Touch® Disposable Diapers • BMXC • Jun 24, 2024 8:00 AM
Last Shot Hydration Drink Announced as Official Sponsor of Red River Athletic Conference • EQLB • Jun 20, 2024 2:38 PM
ATWEC Announces Major Acquisition and Lays Out Strategic Growth Plans • ATWT • Jun 20, 2024 7:09 AM
North Bay Resources Announces Composite Assays of 0.53 and 0.44 Troy Ounces per Ton Gold in Trenches B + C at Fran Gold, British Columbia • NBRI • Jun 18, 2024 9:18 AM
VAYK Assembling New Management Team for $64 Billion Domestic Market • VAYK • Jun 18, 2024 9:00 AM