InvestorsHub Logo
Followers 7
Posts 410
Boards Moderated 0
Alias Born 06/04/2014

Re: None

Thursday, 07/20/2017 8:26:01 AM

Thursday, July 20, 2017 8:26:01 AM

Post# of 4986
Torchlight Completes Drilling First Horizontal Well in its Permian (Midland) Basin Acreage

MarketwiredJuly 18, 2017

PLANO, TX--(Marketwired - July 18, 2017) - Torchlight Energy Resources, Inc. (TRCH) ("Torchlight" or the "Company"), today announced that it has completed the drilling stage of the Flying B Ranch #3H well.

The horizontal leg at Total Depth was ~8,300 feet in the Wolfcamp A Bench. Preliminary indications from mud log and gamma ray MWD readings indicated a consistent exposure to the planned pay zone over the entire length of the lateral.

The Company plans to employ a 25 stage frac over a 5,000-foot section of the lateral wellbore where casing was successfully set and cemented in place. Frac design will be consistent with the latest technology being utilized by others in the Midland Basin.

"I am pleased with the drilling program delivered by Torchlight's operating partner Maverick on this well," stated Rich Masterson, project Geologist. "We have managed to stay in zone and the logs indicate that we should be able to frac this well in a manner consistent with other Midland Basin wells targeting the Wolfcamp A interval. We encountered good shows of oil in the samples and good gas on the mud log chromatograph."

"We are excited to have completed the drilling phase of our first horizontal well in the Permian Basin and look forward to delivering the frac to bring this well onto production," stated John Brda, Torchlight's CEO. "We are scheduling the procedure on a 'first available' basis and will target the 5000 feet of Wolfcamp A to create a baseline for 'barrels per 1000 feet of lateral' comparisons to other Midland Basin Wolfcamp A completions. Our first-generation stimulation technique will be evaluated and refined for future wells in the project. Ultimately we are targeting maximum production with lowest declines."
While drilling, the Company captured images and video which can be viewed on the Company website at http://www.torchlightenergy.com/current-projects/midland-basin.

Additionally, Torchlight stimulated the Flying B Ranch #2 vertical test well in the Leonard formation and is in the cleanup and testing phase of this secondary target horizontal interval. Torchlight will continue to report results as available.
About Torchlight Energy