InvestorsHub Logo
Followers 646
Posts 144549
Boards Moderated 1
Alias Born 05/19/2007

Re: None

Wednesday, 07/19/2017 10:10:47 AM

Wednesday, July 19, 2017 10:10:47 AM

Post# of 155
Bravura Ventures has submitted a plan of operations application to the U.S Forestry Service requesting permission to build drill roads and sites for a forthcoming exploration and definition drilling program. Proposed operations under the application maybe conducted over a three-year period, thus allowing for a flexible drilling program and one that could span multiple field seasons. Proposed operations include the reopening of a total of approximately 2,045 metres of previously-constructed and reclaimed drill roads, the construction of a total of approximately 470 metres of completely new road, and the construction of a total of 14 drill sites each approximately 6 metres by 12 metres in area. As many as 3 drill holes per site may be drilled at each site, for a possible total of up to 42 holes and 12,800 metres of total drilling.

$BRVVF