Salazar Cuts 16.60 Metres (15.60m True) Averaging 3.66 g/t Gold, 117.40 g/t Silver, 4.88% Copper, 5.36% Zinc Northeast of the El Domo Deposit at Its Curipamba Project http://www.marketwired.com/press-release/salazar-cuts-1660-metres-1560m-true-averaging-366-g-t-gold-11740-g-t-silver-488-copper-tsx-venture-srl-2216260.htm VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 15, 2017)