Makaya, How did you make out visiting, I'd love to know?

My understanding is that a press release is not far away at all, but they will not release any forward looking releases anymore, and heck, I certainly don't blame them. Everything forward looking has been wrong time-wise, though eventually most of what they have said has ultimately occurred, but so far off that it's embarrassing.

The good part about that is that the next time we hear news, it should be stuff that has already occurred or is occurring.

The BLM has the following on their site under FAQs, it may be slightly outdated, but its stuff we already know:

https://eplanning.blm.gov/epl-front-office/eplanning/planAndProjectSite.do?methodName=dispatchToPatternPage¤tPageId=55912

WHO: West Port Energy LLC (WPE) is a development company and operator for the West Port Gold project.

WHAT: The West Port Gold placer gold deposit is a gold bearing alluvial gravel deposit located in the historic Middle Camp Mining district West North West of Quartzsite, AZ.

WHERE: The West Port Gold placer deposit lies approximaelly 130 miles West of Phoenix, Arizona, in La Paz County.
The deposit lies within the 20 acre WPE#1 placer mining claim in the Middle Camp Mining district which lies West and Northwest of Quartzsite, AZ.
The legal description of the West Port Gold placer deposit is:
Gila and Salt River Meridian,
Township 4 North,
Range 20 West,
ection 28, NW 1/4.

WHY: Gold bearing quartz veins were discovered in this district in the 1860's.
Intermittent small placer gold prospects and mining operations have continued to the present.
Previous operators failed to develop the deeper placer gravels on the WPE#1 placer claim.

HOW: WPE will mine the gold bearing gravel deposit with an open pit mine plan.
They will use a bulldozer, an excavator, a loader and truck to mine and move the gravels.
The gravels will be processed in a wet process placer plant at the south end of the deposit.

WHEN: WPE is making their final evaluations of the deposit and have started with all the permits required for mining in Arizona.
The BLM has completed the NEPA document but have not authorized mining.
West Port Energy LLC (WPE) submitted a revised Mine Plan of Operation (MPO) in November, 2016.
WPE and the YFO completed the Environental Assessment in November, 2016 and it is posted on this website for your review.