The international summit “Hydropower Balkans 2017”

http://www.hydropowerbalkans.com/en/

Shala Energy Group Reference:

http://www.hydropowerbalkans.com/en/investment-project/

Shala Energy project construction. Shala Energy company, Albania.

Cascade of medium HPPs with total capacity of 127 MW. The total cost of the project will be about US$272.7 million, which includes the plant’s civil works, equipment, transmission lines and other costs. Shala Energy is a concessionaire company in Albania granted concession rights for 35 years for the purpose of the construction of a hydropower plant cascade on the Shala River.
Theti HPP: Capacity: 7.2 MW;
Grunasi HPP: Capacity: 10.4 MW;
Nderlyse HPP: Capacity: 19.5 MW;
Lekaj HPP: Capacity: 22.2 MW;
Breg Lumi HPP: Capacity: 8.3 MW;
Vajvishti HPP: Capacity: 60.0 MW.