Salazar intersects 14.43 metres (13.07m true) averaging 2.65 g/t gold, 10.58 g/t silver, 1.32% copper, 6.63% zinc at its Curipamba Project Hole extends mineralization of El Domo deposit http://www.marketwired.com/press-release/salazar-intersects-1443-metres-1307m-true-averaging-265-g-t-gold-1058-g-t-silver-132-tsx-venture-srl-2204945.htm VANCOUVER, BRITISH COLUMBIA--(Marketwired - March 23, 2017)