TCP was an object failure.

In 2013, the Company entered into an Equipment Lease/Option to Purchase Agreement (“TransCanada Lease”) with TransCanada Keystone Pipeline, L.P. by its agent TC Oil Pipeline Operations, Inc. ("TransCanada") which agreed to lease and test the effectiveness of the Company’s AOT technology and equipment on one of TransCanada’s operating pipelines. As previously reported in our 10-K report filed with the SEC on March 16, 2015, in June 2014, the equipment was accepted by TransCanada and the lease commenced and the first full test of the AOT equipment on the Keystone pipeline was performed in July 2014 by Dr. Rongjia Tao of Temple University, with subsequent testing performed by an independent laboratory, ATS RheoSystems, a division of CANNON™ (“ATS”) in September 2014. [color=red]]Upon review of the July 2014 test results and preliminary report by Dr. Tao, QS Energy and TransCanada mutually agreed that this initial test was flawed due to, among other factors, the short term nature of the test, the inability to isolate certain independent pipeline operating factors such as fluctuations in upstream pump station pressures, and limitations of the AOT device to produce a sufficient electric field to optimize viscosity reduction. [/colorSubsequent testing by ATS in September 2014 demonstrated viscosity reductions of 8% to 23% depending on flow rates and crude oil types in transit. In its summary report, ATS concluded that i) data indicated a decrease in viscosity of crude oil flowing through the TransCanada pipeline due to AOT treatment of the crude oil; and ii) the power supply installed on our equipment would need to be increased to maximize reduction in viscosity and take full advantage of the AOT technology. While more testing is required to establish the efficacy of our AOT technology, we are encouraged by the findings of these field tests performed under commercial operating conditions. The TransCanada Lease was terminated by TransCanada, effective October 15, 2014. Upon termination of the TransCanada Lease, all equipment was uninstalled, returned, inspected and configured for re-deployment.



KMI contract..has were not incepted no matter how the company tries to spin it! 24 hours testing after 2 years! Management is laughing out loud!

On July 15, 2014, the Company entered into an Equipment Lease/Option to Purchase Agreement (“Kinder Morgan Lease”) with Kinder Morgan Crude & Condensate, LLC (“Kinder Morgan”) under which Kinder Morgan agreed to lease and test the effectiveness of the Company’s AOT technology and equipment on one of Kinder Morgan’s operating pipelines. Equipment provided under the Lease includes a single AOT Midstream pressure vessel with a maximum flow capacity of 5,000 gallons per minute. The equipment was delivered to Kinder Morgan in December 2014 and installed in March 2015. In April 2015, during pre-start testing, low electrical impedance was measured in the unit, indicating an electrical short. A replacement unit was installed May 2015. The second unit also presented with low impedance when flooded with crude condensate from Kinder Morgan’s pipeline. Subsequent to design modifications, a remanufactured AOT unit was installed and tested at Kinder Morgan’s pipeline facility in in August 2015. Initial results were promising, with the unit operating generally as expected. However, voltage dropped as preliminary tests continued, indicating decreased impedance within the AOT pressure vessel. QS Energy personnel and outside consultants performed a series of troubleshooting assessments and determined that, despite modifications made to the AOT, conductive materials present in the crude oil condensate continued to be the root cause of the decreased impedance. Based on these results, QS Energy and Kinder Morgan personnel mutually agreed to hold on final acceptance of equipment under the lease and temporarily suspend in-field testing to provide time to re-test crude oil condensate in a laboratory setting, and thoroughly review and test selected AOT component design and fabrication. Subsequent analysis and testing led to changes in electrical insulation, inlet flow improvements and other component modifications. These design changes were implemented and tested by Industrial Screen and Maintenance (ISM), one of QS Energy's supply chain partners in Casper, Wyoming. Test performed by ISM at its Wyoming facility indicated significant improvements to system impedance and efficiency of electric field generation.

In February 2016, the modified AOT equipment was installed at Kinder Morgan’s facility. Pre-acceptance testing was performed in April 2016, culminating in more than 24 hours of continuous operations. In-field viscosity measurements and pipeline data collected during this test indicate the AOT equipment is operating as expected, resulting in viscosity reductions equivalent to those measured under laboratory conditions. Supervisory Control And Data Acquisition (“SCADA”) pipeline operating data collected by Kinder Morgan during this test indicated a pipeline pressure drop reduction consistent with expectations. Kinder Morgan has provided the Company with a number of additional crude oil samples to be tested in the laboratory for future test correlation and operational planning purposes. Subject to final review, Kinder Morgan and QS Energy will determine next steps which may include integration of Kinder Morgan’s SCADA system with the AOT control system, 30 days of continued operation during batched pipeline flow, and final installation and acceptance of the equipment under the lease.




The company managment and products are failures wiuth exception of the inate ability to continue to decieve investors for sole purpose of continueing the lifestyle of insider erichment.