Right322, actually it is not amazing at what this fake company just stated at all as nearly every press release from this company has been, to use the now common vernacular "Fake News".

Their only claim to fame is their tiny green homemade "patented reactor", located in a deserted, unmarked rundown tiny rented warehouse at 235 West Marvin Avenue, Longwood Florida. They won't put a sign on it and they won't reveal this location because if the public ever sees it, they will know it is all pump and dump scam. You can finally see an 8 second video of it on their Facebook page and all it does is make a little noise. What a poor cheap excuse for a scam!

I have friends who watch that scam location and it is absolutely a dead little place. Even the sign company owner located directly across the street has stated he has no idea what is in that warehouse or what they allegedly do. (And they could easily make them a very professional sign!). If you are ever in the Orlando area, drive there and check out this dead little warehouse - you won't get inside however but you can see the total lack of activity from the outside. It is only 15 minutes from the Orlando Airport.

They have over $20 million in net losses and not one penny in earned income even though EK Labs was supposed to be a "For Profit Center". What a joke. Almost all of the companies they signed deals with have been proven by me in my posts to be on paper only created scam jobs, such as RRDA, Harvest Technology, ad nauseam. Simply read my posts going back just 6 months and you will see exactly what I mean.

I have pasted in just on of many examples of my posts as shown below for your convenience that shows endless fake news from ALLM. By the way, RRDA was created on paper in 2014 in affiliation with ALLM with no assets or expertise and was located in a residential home in Georgia. One of the 3 founders of RRDA had recently just beforehand, had a home foreclosed on. He couldn't even make a house payment but yet he was going to be the one to build as many as dozens of factories using fake ALLM technology!

Old post:

One year after working with DCR Engineering, there's still no money
coming in - this old press release said that the money should be
flowing in by now:

<<WEST PALM BEACH, Fla., Aug. 11, 2015 (GLOBE NEWSWIRE) -- Alliance BioEnergy Plus, Inc. (OTCQB:ALLM) (the "Company") announced today the completion of FEL 1, the first of four engineering stages that are required to complete construction of the first commercial CTS plant to be located in central Georgia and expected to break ground this fall.

Working together with Process Engineering Associates, LLC in Alabama and DCR Engineering Services of Tampa, Fl the Company completed this first critical phase weeks ahead of schedule and under budget, which allowed the team to proceed immediately with FEL 2 and start focusing more on the site-specific components of the process.

The engineering process for building a plant, that can convert a 1,000 mt a day of cellulose biomass, using the CTS patented system is a four-stage process; Front-End-Loading known as FEL 1 thru 3 and Detail. FEL 1, which is now complete, focused on magnitude. This includes the general layout of the plant, project scope, design and execution strategy, as well as capacity, raw material handling and storage needs. FEL 1 also started to look at major equipment size and sources, local civil engineering requirements and local utilities and infrastructure. FEL 2, which is now underway, starts to get much more specific on these and many other components of the build including; site specific needs, PFD’s with heat and material balances as well as product purity, piping and electrical layouts. FEL 2 is expected to be complete in early Q4 2015.

The Company anticipates that its central Georgia licensee, RRDA, will break ground on the first commercial plant in the 4th quarter of 2015 and be ready for operations sometime in early summer of 2016. “We are extremely pleased with the progress of the plant engineering and how well this team works together.” Said Jim Brown, President of the Company's subsidiary AMG Energy Group who is tasked with overseeing this project. He went on to say, “We are ahead of schedule, under budget and the scientific team under Dr. Blair really has a grasp on the science, which has made this entire process so much simpler, what else can you ask for.”

Once the critical Process Engineering (FEL 1 & 2) is complete in Q4 2015 and the focus turns to local site prep the Company can start to collect on its signed $25 million territory license agreement and would expect to start collecting royalties form multiple licensees by mid summer 2016. >>

http://www.otcmarkets.com/stock/ALLM/news/Alliance-BioEnergy-Plus--Inc--Completes-FEL-1-Engineering-Stage-For-Construction-of-First-Commercial-Plant?id=111873&b=y

I wouldn't expect anything different from this announcement with
DCR Engineering. More promises and no delivery!

http://www.otcmarkets.com/stock/ALLM/news/Alliance-BioEnergy-and-DCR-Engineering-Join-Forces?id=138551&b=y