"Subject to final review, KM and QS Energy will determine next steps which may include integration of KM's SCADA system with the AOT control system, 30 days of continuous operation during batched pipeline flow, and final installation and acceptance of the equipment under the lease."

I thought everyone thought the KM relationship was a busted stick. Doesn't look like it from here kids. And this is only skimming the report without dissecting it.