InvestorsHub Logo
Followers 0
Posts 79
Boards Moderated 0
Alias Born 04/25/2011

Re: None

Wednesday, 10/12/2016 11:22:54 AM

Wednesday, October 12, 2016 11:22:54 AM

Post# of 246
Excellent News from LION ONE METALS

New Discovery Underway at the Jomaki Ridge Prospect
Tender Submitted for Adjoining Navilawa Tenement
Dewatering and Drilling Contractors Mobilized at Tuvatu

North Vancouver, B.C., October 12, 2016. Lion One Metals Limited (TSX-V: LIO) (ASX: LLO) (OTCQX: LOMLF) (FSX: LY1) (the “Company”) is pleased to announce that it has submitted a tender for the acquisition of the Navilawa tenement directly adjoining the Company’s 100% owned and fully permitted Tuvatu Gold Project, located on the island of Viti Levu in Fiji. The Company also announces that exploration on a new discovery is underway at the Jomaki Ridge Prospect inside the Tuvatu Mining Lease, and that dewatering and drilling contractors have been retained and mobilized for the next phase of development at Tuvatu.

Navilawa Tender

Fiji’s Mineral Resources Department (MRD) publically solicited expressions of interest for the new Navilawa tenement in July and August of 2016 after the lapse and expiry of the previous holder’s exploration license. The Navilawa tenement directly adjoins the northern boundary of Lion One’s tenements at Tuvatu, which if combined, would consolidate ownership of the entire Navilawa mineral complex under a +30,000 hectare exploration license package with Tuvatu’s 384.5 hectare Mining Lease (SML 62) and mining and processing operation, currently under development, at its center. The Company has submitted a tender for the Navilawa tenement with $15 million of initial exploration expenditures proposed over five years.

The Navilawa project area has at least 10 well defined prospects including the Kingston Mine, Banana Creek, and Tuvatu North. The most significant historic results returned were surface rock chip samples of 46.30 g/t Au from Banana Creek; 176.27 g/t Au from the Kingston Mine, and 8.50 g/t Au from Tuvatu North, where a rock chip sample was taken from just inside SPL 1296 and adjacent to the Tuvatu resource. Although little systematic historical exploration has been undertaken in the area, six of the prospects have historic workings with short shafts or adits up to 15 meters deep or manual workings on copper and gold bearing rocks as is the case at the Central Ridge prospect. Mapping, sampling and geophysics clearly demonstrates that the Tuvatu gold deposit extends north into the Navilawa tenement area.

On a macro scale there is mineralization evident from the Banana Creek prospect, well within the Navilawa tenement, all the way to the Jomaki Ridge Prospect at the south end of Lion One’s tenements, demonstrating a NE to SW extent of over 5.5 km. Mineralization also extends along a north-south corridor aligning the Upper Ridges Lodes of Tuvatu with the Kingston Mine 2 km to the north. Navilawa hosts a multi-phase monzonitic intrusive system exhibiting epithermal styles of mineralization, with some porphyry affinities. The MRD has advised that Lion One should be notified of the result of its tender proposal before the end of October 2016.



Jomaki Discovery

Exploration of a new discovery is underway at the Jomaki Ridge Prospect situated within SML 62, 1.50 km south-west of the planned processing plant site at Tuvatu. Lion One’s Fiji exploration team has discovered significant extensions of a pervasively altered and densely veined zone situated between the contact of volcanic units and the micro-monzonite intrusive. Visible gold has been detected at the surface and in some recently dug trenches. Trenching and sampling has begun to test outcrops and near-surface mineralization, with initial rock chip sampling returning results up to 125 g/t Au. An extensive NE-SW veinset at Jomaki Ridge is cross cut by additional NS veins which are thought to be extensions of the UR1 and UR 2 Lodes already recognized at Tuvatu. Further sampling results are expected by late October, with 183 samples already dispatched to Townsville, Qld. for analysis, and will be followed by more samples collected from the extensive trenching program across the width and strike length of the mineralized zone currently underway.

Dewatering, Decline, Drilling

The Company also reports that its prime contractors and suppliers have been retained and equipment has been purchased for dewatering, drilling, and rehabilitation of the existing decline. A new diesel powered pumping station has been delivered and is scheduled to become operational in late October. Based on prior testing, the Company estimates that less than 30 days of pumping will be required to dewater past the Core Shed Fault, 150 meters inside the decline. The Company plans to have diamond drill rigs operating on surface by late October and underground by late November, to focus on numerous infill and extensional targets of the existing mineralized lodes at Tuvatu.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LOMLF News