If you were to study the systematic methods of our JV partner, MarMar, you would have little doubt that production is happening very soon.

The leach pad is lined, the base ore/rocks are almost if not complete, and then the pad will be loaded, and the cyanide will flow.

The production equipment is being manufactured in Monterrey, Mexico by MarMar, and also may be finished or shipped by now.

Production to commence in October. October is 19 days away.