InvestorsHub Logo
Followers 30
Posts 3717
Boards Moderated 0
Alias Born 03/06/2011

Re: KansasCrude post# 6543

Thursday, 04/28/2016 12:18:07 PM

Thursday, April 28, 2016 12:18:07 PM

Post# of 47600
We've a very narrow and dangerous shaft which will need safety provisions first of all. That is risk and labor intensive up from down and near same vein materials are right at the surface so clear and line a small pad to go perfectly safe down from the top using only earth movers, grade the material by shallow drills and put the weak on the cheap pad and the good in the mill. During short time follows build the rest to leach then recover. Can't get results faster but FIRST had to fully inform authorities of the plan and get a permit to do only that much and took the 2 weeks they said. Now all that is underway going just one direction and spinning wheels have stopped for rapid progress AND raising cash along the path to larger stuff. Sounds good here bouts. Fastest and cheapest always seems best with added in safety. 8

lots more heavy equip operators than good hard rock miners both Cesar and PT aware. AND demand get paid less I'd wager.